My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-377
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-377
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 11:56:09 AM
Creation date
9/30/2015 10:15:19 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Plan
Approved Date
10/24/2006
Control Number
2006-377
Agenda Item Number
11.J.5.
Entity Name
Indian River County Department of Utility Services
Subject
Water & Wastewater Standards-updated October 2006
Supercedes all previous versions
Supplemental fields
SmeadsoftID
5936
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> i <br /> 4, 10 INSTALLATION <br /> +. A. Unless otherwise noted on the drawings or in other sections of this <br /> specification , the pipe shall be handled and installed in strict <br /> accordance with the manufacturer's instructions. The Contractor shall <br /> .. use every precaution during construction to protect the pipe against <br /> the entry of non-potable water, dirt, wood , small animals , and any <br /> other foreign material that would hinder the operation of the pipeline. <br /> i Where the groundwater elevation is above the bottom of the trench , <br /> the Contractor shall provide suitable dewatering . All piping shall be <br /> placed in a dry trench , unless the Engineer or IRCDUS approves wet <br /> trench installation . <br /> i <br /> B . Depth of Cover and Pipe Elevation : Unless otherwise shown on the <br /> drawings, or otherwise authorized by the Engineer, all pipe shall have <br /> " a minimum cover of 36 inches . Contractor shall determine top of pipe <br /> elevation and top of ground elevation for every two joints of pipe <br /> installed using a level . Pipe must have the minimum cover described <br /> i above and must be within +/- 0. 2 feet of the top of pipe elevation <br /> indicated on the drawings . Installed pipe , which does not meet these <br /> requirements , shall be reinstalled until it does meet these <br /> requirements . Contractor shall record top of pipe and top of ground <br /> elevations and the locations of where these elevations were <br /> determined and submit this information to Engineer. Engineer <br /> reserves the right to have Contractor excavate and check top of pipe <br /> i and top of ground elevations to see if they conform to the <br /> aforementioned requirements, at no cost to the Owner. <br /> a <br /> END OF SECTION <br /> a <br /> a <br /> a <br /> a <br /> a <br /> s <br /> 4 - 5 <br /> a <br />
The URL can be used to link to this page
Your browser does not support the video tag.