My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-377
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-377
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 11:56:09 AM
Creation date
9/30/2015 10:15:19 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Plan
Approved Date
10/24/2006
Control Number
2006-377
Agenda Item Number
11.J.5.
Entity Name
Indian River County Department of Utility Services
Subject
Water & Wastewater Standards-updated October 2006
Supercedes all previous versions
Supplemental fields
SmeadsoftID
5936
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. A 2" wide magnetic I . D . location tape is required over all pipes. <br /> Tape is to be installed 12" below proposed grade. <br /> 5.08 INSTALLATION <br /> , . A. Unless otherwise noted on the drawings or in other sections of this <br /> specification , the pipe shall be handled and installed in strict <br /> accordance with the manufacturer's instructions. The Contractor <br /> shall use every precaution during construction to protect the pipe <br /> against the entry of non-potable water, dirt, wood , small animals , <br /> and any other foreign material that would hinder the operation of <br /> the pipeline. Where the groundwater elevation is above the <br /> bottom of the trench , the Contractor shall provide suitable <br /> dewatering equipment at no additional cost to the Owner. All <br /> piping shall be placed in a dry trench , unless the Engineer or <br /> IRCDUS approves wet trench installation . <br /> B . Depth of Cover and Pipe Elevation : Unless otherwise shown on <br /> = the drawings , or otherwise authorized by the Engineer, all pipe <br /> shall have a minimum cover of 36 inches. Contractor shall <br /> determine top of pipe elevation and top of ground elevation for <br /> ,. every two joints of pipe installed using a level . Pipe must have the <br /> minimum cover described above and must be within +/- 0 . 2 feet of <br /> the top of pipe elevation indicated on the drawings . Installed pipe , <br /> which does not meet these requirements, shall be reinstalled until <br /> it meets these requirements . Contractor shall record top of pipe <br /> and top of ground elevations and the locations of where these <br /> elevations were determined and submit this information to <br /> Engineer. Engineer reserves the right to have Contractor excavate <br /> and check top of pipe and top of ground elevations to see if they <br /> conform to the aforementioned requirements, at no additional cost <br /> to the Owner. <br /> .. END OF SECTION <br /> r <br /> r <br /> r <br /> 5 - 3 <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.