My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-078
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2016 2:07:31 PM
Creation date
9/30/2015 7:26:44 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Manual
Approved Date
04/06/2004
Control Number
2004-078
Agenda Item Number
11.J.1
Entity Name
Department of Utility Services
Subject
Utility Services Water Wastewater Utility Standards
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3719
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Manufacturer' s Product List for the separate components . ( See <br /> IRCDUS Standards , Detail Drawings S- 16 . ) <br /> 8 . 12 SHOP PAINTING <br /> A. Before exposure to weather and prior to shop painting , all <br /> surfaces shall be thoroughly cleaned , dry and free from all mill. <br /> scale , rust, grease , dirt and other foreign matter. <br /> B . All pumps and motors shall be shop primed , with primer <br /> compatible with the field painting . <br /> C . All nameplates shall be properly protected during painting . <br /> D . Gears , bearing surfaces , and other similar surfaces obviously not <br /> to be painted shall be given a heavy shop coat of grease or other <br /> suitable rust-resistant coating . This coating shall be maintained <br /> as necessary to prevent corrosion during periods of storage and <br /> erection , and shall be satisfactory to the Engineer up to the time of <br /> final acceptance test. <br /> E . Control Panels shall be made of stainless steel . <br /> 8 . 13 FIELD PAINTING <br /> A. The primer and paint used in the shop shall be products of the <br /> same manufacturer as the field paint to assure compatibility. <br /> B . All nameplates shall be properly protected during painting . <br /> 8 . 14 LIFT STATION LINERS <br /> A. Liners shall be installed at all repumped lift stations and as <br /> required by IRCDUS 's Engineer. <br /> B . The lift station liner shall meet all requirements of ASTM <br /> Specifications D-3753 for glass fiber reinforced polyester <br /> manholes or lift stations . See Approved Manufacturer's Product <br /> List <br /> C . After the lift station lining operation has been completed , the <br /> Contractor in the presence of the IRCDUS 's representative shall <br /> visually inspect the lift station . In addition , at the IRCDUS ' s <br /> request, the Contractor shall be required within one year to <br /> visually inspect the lift stations that were lined . The Contractor <br /> shall redo any work that has become defective . <br /> D . Fiberglass liners shall have a three-year warranty period . <br /> END OF SECTION <br /> 8 - 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.