My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-078
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2016 2:07:31 PM
Creation date
9/30/2015 7:26:44 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Manual
Approved Date
04/06/2004
Control Number
2004-078
Agenda Item Number
11.J.1
Entity Name
Department of Utility Services
Subject
Utility Services Water Wastewater Utility Standards
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3719
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
elevation shall be a minimum of 12-inches above the associated elevations <br /> shown on the FIRM ( Flood Insurance Rate Map ) or 12 inches above the 25-year <br /> - 24-hour storm event elevation , whichever is greater. <br /> I . In IRCDUS maintained lift station , pumps shall be per the Approved <br /> Manufacturer's Product List. If a grinder pump is proposed , see Approved <br /> Manufacturer' s Product List. Only grinder pumps under 10 . 0 hp are permitted <br /> unless approved by IRCDUS . <br /> J . Lift Station Calculation Checklist (all assumptions shall be listed in calculations <br /> and in an orderly fashion ) : <br /> 1 . Design flow <br /> 2 . Downstream force main size & down stream head pressure ( in psi or feet <br /> of water) <br /> 3 . TDH of pumps shall exceed system head curve <br /> 4 . Pump selection make , model , HP , impeller <br /> 5 . a . Wet well dimensions <br /> b . Operating cycle and draw down time <br /> 6 . Buoyant computations Documentation : <br /> a . Buoyant force <br /> b . Downward force <br /> c. Safety factor <br /> d . Depth to water table <br /> 7 . Designer name , date , design firm , Indian River County project number, <br /> project name , designer name of revisions <br /> K. Only one influent gravity main is allowed into the lift station . The first upstream <br /> manhole from the lift station must be located within 20 feet +/- 1 -foot of the lift <br /> station and as approved by IRCDUS . <br /> L. The owner of a private lift station must have a maintenance agreement with a <br /> qualified firm (individual ) to maintain the lift station . A label must be posted on <br /> the lift station stating the name and 24-hour phone number of the responsible <br /> firm before lift station may be placed into operation . <br /> 11 . 03 WATER DISTRIBUTION <br /> A. All water mains shall be constructed in accordance with the Indian River County <br /> Water Master Plan , latest edition , or current AWWA Standard Specifications and <br /> current regulatory agencies requirements . <br /> B . All distribution systems shall be properly looped , where feasible , and valved to <br /> provide maximum flexibility in providing service . <br /> C . Design shall be based on an average daily consumption of 100-gallons per <br /> capita per day , a maximum day (MD ) factor of 2 . 25 times average day and a <br /> peak hour factor of 4 . 5 times average day, per Indian River County Ordinance . <br /> 11 - 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.