My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-078
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2016 2:07:31 PM
Creation date
9/30/2015 7:26:44 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Manual
Approved Date
04/06/2004
Control Number
2004-078
Agenda Item Number
11.J.1
Entity Name
Department of Utility Services
Subject
Utility Services Water Wastewater Utility Standards
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3719
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 . For Categorical Users Subject to Total Toxic Organic (TTO ) Requirements : <br /> Provide the following (TTO ) information . <br /> a . Does (or will ) this facility use any of the toxic organics that are listed under <br /> the TTO standard of the applicable categorical pretreatment standards <br /> published by EPA? <br /> ( ) Yes <br /> ( ) No <br /> b . Has a baseline monitoring report ( BMR) been submitted which contains <br /> TTO information ? <br /> ( ) Yes <br /> ( ) No <br /> C, Has a toxic organics management plan (TOMP ) been developed ? <br /> ( ) Yes ( Please attach a copy) <br /> ( ) No <br /> 8 . Do you have , or plan to have , automatic sampling equipment or continuous wastewater <br /> flow metering equipment at this facility? <br /> Current: Flow metering ( ) Yes ( ) No ( ) N/A <br /> Sampling Equipment ( ) Yes ( ) No ( ) N/A <br /> Planned : Flow metering ( ) Yes ( ) No ( ) N/A <br /> Sampling Equipment ( ) Yes ( ) No ( ) N/A <br /> If so , please indicate the present or future location of this equipment on the sewer <br /> schematic and describe the equipment below: <br /> 9 . Are any process changes or expansions planned during the next three years that could <br /> alter wastPwatPr volumes or rharac:tPristics ? CnnsidPr nroressPs as well as air or water <br />
The URL can be used to link to this page
Your browser does not support the video tag.