My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-078
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2016 2:07:31 PM
Creation date
9/30/2015 7:26:44 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Manual
Approved Date
04/06/2004
Control Number
2004-078
Agenda Item Number
11.J.1
Entity Name
Department of Utility Services
Subject
Utility Services Water Wastewater Utility Standards
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3719
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOTES . <br /> 1 . A temporary jumper connection is required at all connections between existing active <br /> water mains and proposed new water main improvements . <br /> 2 . The Temporary Jumper Detail (W - 12A) is to be used for filling any new water main of any <br /> size from the existing active water mains and for the flushing of new mains up to 6" <br /> diameter (2 . 5 FPS minimum velocity) and for pulling bacteriological samples from any <br /> new water main of any size . <br /> 3 . The jumper connection shall be maintained until after the filling , flushing , testing and <br /> disinfection of the new main has been successfully completed and clearance for use from <br /> the Florida Department of Environmental Protection ( FDEP ) and other pertinent agencies <br /> has been received . Adequate thrust blocking and/or restraints shall be provided <br /> temporarily, as required . <br /> 4 . Pipe and fittings used for connecting the new pipe to the existing pipe shall be disinfected <br /> prior to installation in accordance with AWWA C651 , LATEST EDITION . The tapping <br /> sleeve and exterior of the main to be tapped shall be disinfected by spraying or swabbing <br /> per section Two of AWWA C651 . The use of tablets is strictly prohibited . <br /> 5 . The Jumper connection shall also be used to maintain a minimum pressure of 20 PSI in <br /> the new mains continuously after disinfection and until FDEP clearance letter is obtained . <br /> 6 . The Contractor shall provide documentation demonstrating that the double check <br /> backflow prevention device is in good working order at the time of installation , and <br /> provide documentation that the double check backflow prevention device has been tested <br /> in the last 12 months , and is in good working order one year from installation by <br /> a <br /> qualified backflow technician as approved by IRCDUS . <br /> 7 . Except as required to flush lines greater than 6 " diameter, the tie- in valve shall remain <br /> closed and shall be locked in the closed position by the utility company . The tie- in valve <br /> shall remain locked closed until the new system has been cleared for use by the FDEP <br /> and all other pertinent agencies . <br /> 8 . Upon receipt of clearance for use by FDEP and all other pertinent agencies , the <br /> Contractor shall remove the temporary jumper connection . The corporation stops are to <br /> be closed and plugged with 2" brass or PVC stops . <br /> 9 . All installation and maintenance of the temporary jumper connection and associated <br /> backflow prevention device , fittings , valves , etc. , shall be the responsibility of the <br /> Contractor. <br /> 10 . If the water main to be flushed is greater than 6" diameter or such length that a full pipe <br /> flush at the 2 . 5 FPS velocity cannot be accomplished , the following procedure shall be <br /> utilized . <br /> a ) Install pressure gauges as indicated on Temporary Jumper Detail (W - 11 ) . <br /> b ) Open all downstream valves in the new system prior to flush . <br /> c) Flush new water main thru tie- in valve maintaining a 10 +/- PSI pressure <br /> differential between gauges during flush . <br /> d ) IRCDUS personnel , in the presence of the Engineer of Record shall operate tie- <br /> in valve to insure that the required pressure differential is maintained . <br /> Lrt <br /> INDIAN RIVER COUNTY VER TEMPORARY NON <br /> DEPARTMENT OF Q z JUMPER DETAIL W - 12 <br /> UTILITIES SERVICES N1 n T F ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.