Laserfiche WebLink
5 . A building layout or plant site plan of the premises is required to be completed and <br /> certified for accuracy by a State registered professional engineer. Approved building <br /> plans may be substituted . An arrow showing North as well as the map scale must be <br /> shown . . The location of each existing and proposed sampling location and facility sewer <br /> line must be clearly identified as well as all sanitary and wastewater drainage plumbing . <br /> Number each unit process discharging wastewater to the public sewer. Use the same <br /> numbering system shown in Figure 1 , the schematic flow diagram . <br /> FIGURE 2 — BUILDING LAYOUT <br /> 30 <br />