My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-078
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2016 2:07:31 PM
Creation date
9/30/2015 7:26:44 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Manual
Approved Date
04/06/2004
Control Number
2004-078
Agenda Item Number
11.J.1
Entity Name
Department of Utility Services
Subject
Utility Services Water Wastewater Utility Standards
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3719
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. 10 INSTALLATION <br /> A. Unless otherwise noted on the drawings or in other sections of this <br /> specification , the pipe shall be handled and installed in strict <br /> accordance with the manufacturer's instructions . The Contractor shall <br /> use every precaution during construction to protect the pipe against <br /> the entry of non -potable water, dirt, wood , small animals , and any <br /> other foreign material that . would hinder the operation of the pipeline . <br /> Where the groundwater elevation is above the bottom of the trench , <br /> the Contractor shall provide suitable dewatering . All piping shall be <br /> placed in a dry trench , unless the Engineer or IRCDUS approves wet <br /> trench installation . <br /> B . Depth of Cover and Pipe Elevation : Unless otherwise shown on the <br /> drawings , or otherwise authorized by the Engineer, all pipe shall have <br /> a minimum cover of 36 inches . Contractor shall determine top of pipe <br /> elevation and top of ground elevation for every two joints of pipe <br /> installed using a level . Pipe must have the minimum cover described <br /> above and must be within +/- 0 . 2 feet of the top of pipe elevation <br /> indicated on the drawings . Installed pipe , which does not meet these <br /> requirements , shall be reinstalled until it does meet these <br /> requirements . Contractor shall record top of pipe and top of ground <br /> elevations and the locations of where these elevations were <br /> determined and submit this information to Engineer. Engineer <br /> reserves the right to have Contractor excavate and check top of pipe <br /> and top . of ground elevations to see if they conform to the <br /> aforementioned requirements , at no cost to the Owner. <br /> END OF SECTION <br /> 4 - 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.