My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (2)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2026 12:43:10 PM
Creation date
10/1/2015 12:20:20 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA
Entity Name
Ocean Gate General Contractors
Subject
Project No. 06120;Bid No.2008032 8.AA
Supplemental fields
SmeadsoftID
7469
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br />10.01 Provisions for liquidated damages and incentive payments, if any, are set forth in the <br />Agreement. <br />ARTICLE 11 - SUBSTITUTE AND "OR -EQUAL" ITEMS <br />11.01 The Contract, if awarded, will be on the basis of materials and equipment specified or <br />described in the Bidding Documents without consideration of possible substitute or ``or -equal" <br />items. Whenever it is specified or described in the Bidding Documents that a substitute or `'or - <br />equal" item of material or equipment may be furnished or used by CONTRACTOR if acceptable to <br />ENGINEER's CONSULTANT, application for such acceptance will not be considered by <br />ENGINEER until after the Effective Date of the Agreement. The procedure for submission of any <br />such application by CONTRACTOR and consideration by ENGINEER's CONSULTANT is set <br />forth in the General Conditions and may be supplemented in the General Requirements. <br />ARTICLE 12 - SUBCONTRACTORS, SUPPLIERS, AND OTHERS <br />12.01 If the Supplementary Conditions require the identity of certain Subcontractors, Suppliers, <br />individuals, or entities to be submitted to OWNER in advance of a specified date prior to the <br />Effective Date of the Agreement, the apparent Successful Bidder, and any other Bidder so <br />requested, shall within five days after Bid opening, submit to OWNER a list of all such <br />Subcontractors, Suppliers, individuals, or entities proposed for those portions of the Work for <br />which such identification is required. Such list shall be accompanied by an experience statement <br />with pertinent information regarding similar projects and other evidence of qualification for each <br />such Subcontractor, Supplier, individual, or entity if requested by OWNER. If OWNER or <br />ENGINEER, after due investigation, has reasonable objection to any proposed Subcontractor, <br />Supplier, individual, or entity, OWNER may, before the Notice of Award is given, request apparent <br />Successful Bidder to submit a substitute, without an increase in the Bid. <br />12.02 If apparent Successful Bidder declines to make any such substitution, OWNER may <br />award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, <br />Suppliers, individuals, or entities. Declining to make requested substitutions will not constitute <br />grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor, Supplier, individual, or <br />entity so listed and against which OWNER or ENGINEER's CONSULTANT makes no written <br />objection prior to the giving of the Notice of Award will be deemed acceptable to OWNER and <br />ENGINEER's CONSULTANT subject to revocation of such acceptance after the Effective Date of <br />the Agreement as provided in paragraph 6.06 of the General Conditions, <br />12.03 CONTRACTOR shall not be required to employ any Subcontractor, Supplier, individual, or <br />entity against whom OWNER has reasonable objection. <br />ARTICLE 13 - PREPARATION OF BID <br />13.01 The Bid form is included with the Bidding Documents. Additional copies may be obtained <br />from the Issuing Office. <br />11 ni All kl�mU� ^m +k^ MA F..... . L. 11 L� �_.Y.-I_a_J � - --'_ie_ - <br />
The URL can be used to link to this page
Your browser does not support the video tag.