My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (2)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2016 2:24:44 PM
Creation date
10/1/2015 12:20:20 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA
Entity Name
Ocean Gate General Contractors
Subject
Project No. 06120;Bid No.2008032 8.AA
Supplemental fields
SmeadsoftID
7469
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
as provided in paragraph 4 . 06 of the General Conditions. <br /> E. Bidder has obtained and carefully studied (or assumes responsibility for having done so) <br /> all additional or supplementary examinations , investigations, explorations , tests , studies and <br /> data concerning conditions (surface , subsurface and Underground Facilities) at or contiguous <br /> to the Site which may affect cost, progress, or performance of the Work or which relate to any <br /> _ aspect of the means, methods , techniques, sequences , and procedures of construction to be <br /> employed by Bidder, including applying the speck means , methods, techniques, sequences , <br /> and procedures of construction expressly required by the Bidding Documents to be employed <br /> by Bidder, and safety precautions and programs incident thereto. <br /> eJ� <br /> F. Bidder does not consider that any further examinations, investigations , explorations , tests, <br /> studies, or data are necessary for the determination of this Bid for performance of the Work at <br /> the prices) bid and within the times and in accordance with the other terms and conditions of <br /> Lithe Bidding Documents, <br /> G . Bidder is aware of the general nature of work to be performed by OWNER and others at <br /> Lit the Site that relates to the Work as indicated in the Bidding Documents . <br /> _. , H . Bidder has correlated the information known to Bidder, information and observations <br /> obtained from visits to the Site , reports and drawings identified in the Bidding Documents, and <br /> LN <br /> all additional examinations, investigations, explorations, tests, studies , and data with the <br /> Bidding Documents , <br /> I . Bidder has given ENGINEER written notice of all conflicts , errors , ambiguities, or <br /> discrepancies that Bidder has discovered in the Bidding Documents , and the written resolution <br /> thereof by ENGINEER's CONSULTANT is acceptable to Bidder. <br /> J . The Bidding Documents are generally sufficient to indicate and convey understanding of <br /> all terms and conditions for the performance of the Work for which this Bid is submitted . <br /> 4.01 Bidder further represents that this Bid is genuine and not made in the interest of or on <br /> behalf of any undisclosed individual or entity and is not submitted in conformity with any <br /> agreement or rules of any group, association, organization or corporation ; Bidder has not <br /> directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid ; <br /> Bidder has not solicited or induced any individual or entity to refrain from bidding ; and Bidder <br /> has not sought by collusion to obtain for itself any advantage over any other Bidder or over <br /> OWNER. <br /> [The Remainder of this Page Intentionally Left Blank] <br /> nA <br /> �E <br />
The URL can be used to link to this page
Your browser does not support the video tag.