My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (2)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2026 12:43:10 PM
Creation date
10/1/2015 12:20:20 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA
Entity Name
Ocean Gate General Contractors
Subject
Project No. 06120;Bid No.2008032 8.AA
Supplemental fields
SmeadsoftID
7469
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�. Utilities -Water & Wastewater Work <br />U-1 Utility Plan <br />U-2 General Utility Notes <br />Utilities -Water & Wastewater Work (continued) <br />U-3 General Utility Details <br />U-4 Water Details <br />SHEET No. DESCRIPTION <br />U-5 Sanitary Sewer Details <br />U-6 Wastewater Details <br />U-7 Lift Station Details <br />U-8 Lift Station Details <br />U-9 Maintenance of Traffic <br />Architectural Work <br />A0.10 <br />ASO, 10 <br />A1.10 <br />A2.10 <br />A2.20 <br />A2.21 <br />A2.30 <br />A2.40 <br />A3.10 <br />A3.11 <br />A4.10 <br />A4.20 <br />A5.10 <br />A6.10 <br />Structural Work <br />S-1 <br />S-2 <br />S-3 <br />Cover Sheet / Index of Drawings <br />Architectural Site Plan <br />Life Safety Plan / Code Review <br />Floor Plans and Foundation Plans <br />Roof Plans and Roof Details <br />Roof Details <br />Enlarged Plans <br />Reflected Ceiling Plan <br />Exterior Elevations - Restrooms <br />Exterior Elevations - Pavilions <br />Building Sections <br />Wall Sections <br />Interior Elevations <br />Schedules / Door & Window Details <br />Structural Notes & Typical Details <br />Typical Details <br />Restroom & Pavilion, Foundation and Roof Framing Plans, <br />am Schedules <br />S-4 Sections & Wind Diagram <br />Mechanical, Electrical, and Plumbing Work <br />E1.00 Symbols and Fixture Schedules <br />E1.01 Site Plan - Electrical <br />.. E1.02 Photometric Site Plan -Electrical <br />E1.10 Lighting & Power Plans -Electrical <br />E2.00 One Line Diagram & Panel Schedule <br />�. E3.00 Fixture Cut Sheets <br />E3.10 Specification 16000 - Electrical <br />K MA A, - <br />
The URL can be used to link to this page
Your browser does not support the video tag.