Laserfiche WebLink
Item 1 - Response to RFI received subsequent to the issuance of ADDENDUM #4 : <br /> 1 . SHEET U -7 REVISED LIFT STATION : PLEASE PROVIDE A COPY OF THE SFWMD WATER <br /> WITHDRAWLI DEWATERING PERMIT. ALSO PROVIDE A COPY OF THE DEWATERING <br /> PLAN SHOWING WATER DISTRIBUTION , HOLDING , AND REMOVAL . <br /> The means and methods of any required dewatering are up to the CONTRACTOR. CONTRACTOR <br /> needs to be advised he is subject to SJRWMD dewatering criteria, not SFWMD. Also, caisson <br /> installation method should dramatically change dewatering requirements. <br /> 2 . GEOTECHNICAL: THE PILE INSTALLATION IS UNCLEAR WHETHER DRIVING IS <br /> REQUIRED . ALSO , IF DRIVING IS A REQUIREMENT , DOES iT HAVE ANY IMPACT ON TH <br /> TURTLE NESTING SEASON ? <br /> Piling for the boardwalk, ADA ramp, and stairs are not required to be driven; per the DRAWINGS 1 <br /> Coastal Tech: "Piles shall have a minimum embedment of 8 ' feet below existing grade or to <br /> elevation 0. 0 NGVD whichever is lower. " The AM Engineering geotechnical report indicates the <br /> piles are to be driven to final bearing. Pavilion piles may be jetted to within 2 feet of the minimum <br /> tip elevation and driven the last 2 feet <br /> 3 . ITEM # 14 — EXISTING IRRIGATION WELL AND IRRIGATION SYSTEM : PLEASE PROVIDE <br /> THE CHARACTERISTICS OF THE EXISTING WELL. PLEASE PROVIDE THE EXTENT OF <br /> WORK FOR IRRIGATION SYSTEM REPLACEMENT . <br /> Existing piping and wells have been cleared and exposed. A site visit with the plans in hand will <br /> greatly clarify the "assumptions ". Yes, we are aware the existing well data is not known, howeve , <br /> our assumption is that it is not irrigating the sod with salt water and is therefore less than 20 feet <br /> deep. <br /> 4 . A. PLEASE CLARIFY THE LENGTH OF 16 PILES @ 10" DIAMETER FOR THE PAVILION <br /> AREAS , <br /> B . PLEASE CLARIFY THE LENGTH OF ALL 6X6 WOOD PILES FOR BOARDWALKS . <br /> C . PLEASE CLARIFY THE LENGTH OF 6X6 WOOD PILES FOR THE COVERED BENCH <br /> AREA LOCATED AT BOTH SIDES OF 8' WIDE BOARDWALK. <br /> A. For the piles at the pavilion, i.e. 10 " Timber piles the minimum tip elevation should be +9. 0' <br /> NGVD. Section 2/S-4 shows the top of the pile at +28. OWGVD and the top of slab at + 1 & 0-'NGVD. <br /> addition to the minimum tip elevation of +9. 0 the minimum embedment should be 9 feet. So, if tht <br /> final grades are as indicated on the section the minimum final pile length is 19 '-D ". Driving <br /> parameters and cut off may require a longer pile, the pile Contractor should be consulted. <br /> B. 6X6 piles for the main boardwalk shall have a minimum length of 21 . 5 ' [(+ 18 'NGVD - O. ONGVD) <br /> +3.5 'J. Any splices shall occur at the pile cap - as approved by the ENGINEER. <br /> C. 6X6 piles for the covered bench area located a both sides of 8 ' wide boardwalk shall have a <br /> minimum length of 27' [(+ 18 'NGVD - O. ONGVD) +9 'J. Any splices shall occur at the pile cap - as <br /> approved by the ENGINEER <br /> The cost to furnish and install all piling as shown shall be included in the LUMP SUM BID ITEM 2. 01. <br /> 5 . IN SECTION 03000 , ARTICLE 2 . 11 ITEM B , YOUR ENGINEER HAS SPECIFIED THE PILES 11 <br /> BE TREATED WITH .40PCF MCQ WITH THE PILES BEING KILN DRIED AFTER TREATMENT , <br /> IT IS MY STRONG RECOMMENDATION THAT YOU SUGGEST THE USE OF . 80 CCA <br /> PILINGS . <br /> The following wood treatments will be acceptable alternatives for the construction of the boardwalk <br /> CADocuments and Settings\mmclaughlin\Local Settings\Temporary Intemet Res\OLMAddendum #5 (2) .doc <br /> Page 2 of 3 <br />