Laserfiche WebLink
WIN <br /> SCt� i IUN 01541 <br /> PROTECTION OF THE WORK AND PROPERTY <br /> 1 . 1 GENERAL <br /> A . Take all precautions , provide all programs , and take all actions necessary to <br /> P P P 9 rY <br /> maintain , protect, and repair the Work and all public and private property and <br /> facilities from damage until the OWNER formally accepts the Work . <br /> Be In order to prevent damage , injury or loss , CONTRACTOR' s actions shall include , <br /> but not be limited to : <br /> 1 . Store apparatus , materials , supplies , and equipment in an orderly , safe <br /> manner that, will not unduly interfere with the progress of the Work orthe Work'` <br /> of any other Contractor or utility service company . <br /> 2 . Provide suitable storage facilities for all materials that are subject to injury by <br /> exposure to weather, theft , breakage , or otherwise . <br /> 3 . Place upon the Work or any part thereof, only such loads as are consistent <br /> with the safety of that portion of the Work . <br /> 4 . Clean up frequently all refuse , rubbish , scrap materials , and debris caused by <br /> construction operations , so that at all times , the site of the Work presents a <br /> safe , orderly , and workmanlike appearance . <br /> 5 . Provide barricades and guard rails around openings , for scaffolding , for <br /> temporary stairs and ramps , around excavations , elevated walkways , and <br /> other hazardous areas . <br /> 6 . Keep all haul roads clean from dirt and debris from haul operations . <br /> 7 . Provide site drainage ( including temporary drainage systems ) such that the <br /> Work is not damaged as a result of stormwater runoff from rainfall . Ali <br /> protective drainage activities shall comply with the requirements specified <br /> elsewhere herein . <br /> Be Use of Lot. '10 for CONTRACTOR operations is not permitted except as <br /> may be approved by the OWNER . <br /> Co Except after written consent from proper parties , do not enter or occupy <br /> privately-owned land with men , tools , materials or equipment, except on easement <br /> provided . <br /> D . Assume full responsibility for the preservation of all public and private property or <br /> facility on or adjacent to the site and work area . If any direct or indirect damage i . <br /> done by or on account of any act , omission , neglect, or misconduct in the executiorw� <br /> of the Work by the CONTRACTOR, it shall be restored by the CONTRACTOR, at its <br /> expense , to a condition equal to or better than that existing before the damage wa : <br /> done . <br /> Last Revised 3/31 /2008 01541 A R Wabasso Beach Pk Restoration <br /> FAPublic WorkslCliff Suthard\Wabasso Beach Park% Construction Bid Documents\Bid Documents as of 245-20081Technical <br /> SpeclficationslDiv 1101541 - Protection of the Work and Property.doc <br />