Item 1 - Response to RFI received subsequent to the issuance of ADDENDUM #3 : <br /> 1 . ARE THE SIDEWALKS AND PARKING LOTS FOR BOPPY' S AND THE REAL ESTATE GOING <br /> TO STAY , AS IS , OR ARE THEY COMING OUT? <br /> The sidewalks are to stay as is, and CONTRACTOR will be responsible for making a smooth <br /> transition from the parking lot and sidewalk apron to the existing sidewalk. <br /> 2 . SUPPLEMENTARY CONDITION 17 . 14 — MINIMUM PERCENTAGE OF WORK TO BE <br /> PERFORMED BY CONTRACTOR - STATES THE CONTRACTOR MUST PERFORM AT LEAST <br /> 51 % OF THE WORK WITH ITS OWN PERSONNEL AND EQUIPMENT, PLEASE PROVIDE <br /> CLARIFICATION OF THE INTENT OF THE OWNER AS WE WOULD BE UNABLE TO ADHERE <br /> TO THIS CONDITION , BUT WOULD LIKE TO BID THE PROJECT AND HAVE BEEN WORKING <br /> FEVERISHLY TO ASSEMBLE OUR PROPOSAL. <br /> In the CONDITIONS OF THE CONTRACT, Section 00800 Supplementary Conditions to the General <br /> Conditions, Article SC47. 14 Minimum Percentage of Work to be Performed by CONTRACTOR, <br /> DELETE THAT ARTICLE. <br /> 3 . THE FOLLOWING WAS RECEIVED FROM A BIDDER ; " I SPOKE WITH CATHY KEMP THIS <br /> AFTERNOON . (772489-6254) SHE IS THE SERVICE PLANNER FOR FPL FOR THIS SITE . <br /> SHE INDICATED THEFOLLOWING : <br /> THERE IS NO 3 PHASE POWER ON THE POLES ON THE NORTH SIDE OF THE PROPERTY, <br /> THE ONLY WAY TO GET 3 PHASE TO THE NW CORNER IS TO COME ACROSS SR A1A, <br /> WHICH WOULD REQUIRE DOT PERMIT. LENGTHY PROCESS , ACCORDING TO CATHY. <br /> AN OPTION FOR LIFT STATION 3 PHASE WOULD BE TO COME FROM THE CONCRETE <br /> POLE NEXT TO THE SIDEWALK BETWEEN BOPPY' S AND THE REALESTATE OFFICE , SHE <br /> SAID FEES WOULD BE REQUIRED FOR THE TRANSFORMERS AND LABOR . HOW MUCH : <br /> SHE DIDN 'T KNOW. ANOTHER QUESTION FROM MY END WOULD BE , CAN WE RUN <br /> UNDERGROUND THRU THE REAL ESTATE PARKING LOT?" <br /> FPL has already been requested to extend 3-phase power to the power pole shown on the plans, w <br /> see sheet U-8a and the attached service request. It should also be noted that there is no platted <br /> easement between lots 4 and 5 (Boppy's and the Office building), nor do we have any authorization <br /> to install utilities through the private parking lot. <br /> a <br /> C: 1Documents and Settingslmcross\Local Settings\Temporary Internet ReMOLK9ZAdd <br /> endum #4.doc <br /> Page 2 of 2 <br />