Laserfiche WebLink
Commercial and Industrial Project Checklist <br /> FPL <br /> Service Details Additional Electrical Requirements <br /> Wire Size: 60 Main Panel disconnect size (amps) <br /> Number of Sets: 1 Number of meters required <br /> Total Estimated Demand: 8 (kW) Meter address / designation (suite, unit apt, etc) <br /> Total A/C Square Footage: N/A YES Lift Station (Yes / No) <br /> Number of A/C Units: 0 size tons <br /> Other electrical needs <br /> This service is for a county owned lift station only. <br /> 5 Construction Schedule <br /> Please include uw below required Information in (mnvdd/yy) tomcat <br /> 1 ) Clearing, Site Work, Water & sewer May 2008 3) Installation completed by. AU ust 2008 <br /> 2) FPL design layout by Aril 200 4) Desired date for Permanent Service AU ust 200 <br /> 6 Installation of FPL Construction Material <br /> Customer to install: all FPL facilities for credit Directional Bores Tor crossing under roadways or environmental areas to get into project <br /> X FPL to install all of its facilities Customer to directional bore Yes: X No: <br /> FPL to directional bore Yes: a No: 8 <br /> Easement <br /> NX Platted: Yes: X No: <br /> Specific: Yes: No: <br /> Utllity Yes. No: <br /> Final Plat recorded by: I Already Platted (date) <br /> : . <br /> Are there any existing FPL facilities in conflict with proposed construction & critical dates for relocation or removal? <br /> Explain. <br /> f� <br /> Are there any special construction requirements / restrictions. (Use construction entrance only, no weekend work or <br /> work outside of normal working hours)? <br /> Explain: <br /> ® Are there existing buildings on-site to remain in operation during construction? <br /> Explain: Existing 1 phase service lines need to be maintained during 3 phase installation . <br /> ® Are there existing overhead power lines and/or service lines that need to be removed and/or abandoned? <br /> E*aku Existin single phase service to existing 9 9 P g pole . Need 3 phase to existing pole . <br /> Once all above information is received we can begin Design of the Project <br /> Design Phase = 6 - 8 weeks <br /> Scheduling Phase = 3weeks <br /> Construction Phase = dependent on the scope of the project <br /> •" Please send completed form and CAD file toyour Area CPM "• <br /> Please contact your Area CPM for assistance <br /> ! <br />