My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2016 2:22:16 PM
Creation date
10/1/2015 12:20:35 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Bid Number
2008032
Supplemental fields
SmeadsoftID
7470
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Commercial and Industrial Project Checklist <br /> FPL <br /> Service Details Additional Electrical Requirements <br /> Wire Size: 60 Main Panel disconnect size (amps) <br /> Number of Sets: 1 Number of meters required <br /> Total Estimated Demand: 8 (kW) Meter address / designation (suite, unit apt, etc) <br /> Total A/C Square Footage: N/A YES Lift Station (Yes / No) <br /> Number of A/C Units: 0 size tons <br /> Other electrical needs <br /> This service is for a county owned lift station only. <br /> 5 Construction Schedule <br /> Please include uw below required Information in (mnvdd/yy) tomcat <br /> 1 ) Clearing, Site Work, Water & sewer May 2008 3) Installation completed by. AU ust 2008 <br /> 2) FPL design layout by Aril 200 4) Desired date for Permanent Service AU ust 200 <br /> 6 Installation of FPL Construction Material <br /> Customer to install: all FPL facilities for credit Directional Bores Tor crossing under roadways or environmental areas to get into project <br /> X FPL to install all of its facilities Customer to directional bore Yes: X No: <br /> FPL to directional bore Yes: a No: 8 <br /> Easement <br /> NX Platted: Yes: X No: <br /> Specific: Yes: No: <br /> Utllity Yes. No: <br /> Final Plat recorded by: I Already Platted (date) <br /> : . <br /> Are there any existing FPL facilities in conflict with proposed construction & critical dates for relocation or removal? <br /> Explain. <br /> f� <br /> Are there any special construction requirements / restrictions. (Use construction entrance only, no weekend work or <br /> work outside of normal working hours)? <br /> Explain: <br /> ® Are there existing buildings on-site to remain in operation during construction? <br /> Explain: Existing 1 phase service lines need to be maintained during 3 phase installation . <br /> ® Are there existing overhead power lines and/or service lines that need to be removed and/or abandoned? <br /> E*aku Existin single phase service to existing 9 9 P g pole . Need 3 phase to existing pole . <br /> Once all above information is received we can begin Design of the Project <br /> Design Phase = 6 - 8 weeks <br /> Scheduling Phase = 3weeks <br /> Construction Phase = dependent on the scope of the project <br /> •" Please send completed form and CAD file toyour Area CPM "• <br /> Please contact your Area CPM for assistance <br /> ! <br />
The URL can be used to link to this page
Your browser does not support the video tag.