My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2016 2:22:16 PM
Creation date
10/1/2015 12:20:35 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Bid Number
2008032
Supplemental fields
SmeadsoftID
7470
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
shall be transmitted to the panel manufacturer. Any discrepancy between the <br /> information shown on the plans and that provided by the electric company shall be <br /> brought to the attention of the Engineer. <br /> B . Components <br /> The control panel shall include power distribution components for a duplex motor control <br /> center including but not limited to the following components : <br /> 1 . Main Circuit Breaker <br /> 2, Generator Circuit Breaker w/Mechanical Interlock <br /> 3 , Surge Arrestor <br /> 4. Motor Circuit Breaker <br /> 5 , Motor Starters <br /> 6, 120 V. Duplex Receptacle with 15 Amp. Breaker <br /> 7 . Control Power Circuit Breaker <br /> 8 . Generator Receptacle <br /> The control panel shall include control components including but not limited to the <br /> following: <br /> 1 . Control Relays <br /> 2, Automatic Alternator <br /> 3 . Hand-Off-Auto Switches <br /> 4 , Run Lights <br /> 5 , Elapsed Time Meters <br /> 6 , Exterior Alarm Hom <br /> 7 , Exterior Flashing Alarm Lamp <br /> 8 . Phase monitor and shutoffs for each pump <br /> 9 . Seal failure detector with indicator lamp and reset for each pump <br /> 10. RTU data acquisition and control system <br /> C . Component Requirements <br /> 1 . All motor branch circuit breakers, motor starters and control relays shall be of highest <br /> industrial quality, securely fastened to the removable back panels with screws and <br /> lock washers. Back panels shall be tapped to accept all mounting screws. Self- <br /> tapping screws shall not be used to mount any component. <br /> 2 . A thermal-magnetic circuit breaker, appropriately sized for the service and ground <br /> fault interrupting capacity, as manufactured by Square D Company, or approved <br /> equal, shall be furnished for the main breaker. All circuit breakers shall be sealed by <br /> the manufacturer after calibration to prevent tampering. A motor circuit breaker <br /> shall be provided for each motor starter. Each motor circuit breaker shall be <br /> adequately sized to meet the pump motor and station operating conditions. <br /> 3 . A mechanical disconnect mechanism shall be installed on each circuit breaker to <br /> provide a means of disconnecting power to the pump motors. Operator handles for <br /> the disconnect mechanisms shall be located on the exterior of the control <br /> compartment door. <br /> 4. An open frame, across-the -line, NEMA rated, magnetic motor starter, Bulletin 709 <br /> as manufactured by Allen-Bradley Company , or approved equal, shall be furnished <br /> 02539 — Submersible Pump Station (Rev.) <br /> 02539-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.