Laserfiche WebLink
the Contract Documents to be employed by CONTRACTOR, and safety precautions and <br />programs incident thereto. <br />F. CONTRACTOR does not consider that any further examinations, investigations, explorations, <br />tests, studies, or data are necessary for the performance of the Work at the Contract Price, <br />within the Contract Times, and in accordance with the other terms and conditions of the <br />Contract Documents, <br />G. CONTRACTOR is aware of the general nature of work to be performed by OWNER and others <br />at the Site that relates to the Work as indicated in the Contract Documents. <br />H. CONTRACTOR has correlated the information known to CONTRACTOR, information and <br />observations obtained from visits to the Site, reports and drawings identified in the Contract <br />Documents, and all additional examinations, investigations, explorations, tests, studies, and <br />data with the Contract Documents. <br />I. CONTRACTOR has given ENGINEER written notice of all conflicts, errors, ambiguities, or <br />discrepancies that CONTRACTOR has discovered in the Contract Documents, and the written <br />resolution thereof by ENGINEER's CONSULTANT is acceptable to CONTRACTOR. <br />J. The Contract Documents are generally sufficient to indicate and convey understanding of all <br />terms and conditions for performance and furnishing of the Work. <br />K. CONTRACTOR is aware of the specific limitations of the INSTRUCTIONS TO BIDDERS <br />Section 00200 Article 26 PUBLIC ENTITY CRIMES. <br />ARTICLE 9 - CONTRACT DOCUMENTS <br />9.01 Contents <br />A. The Contract Documents consist of the following: <br />1. This Agreement (pages 00520-1 to 00520-9, inclusive); <br />2. Section 00610m Performance Bond (pages 00610-1 to 00610-5, inclusive); <br />3. Section 00612 - Payment Bond (pages 00612-1 to 00612-5, inclusive); <br />4. Section 00700 = General Conditions (pages 00700-1 to 00700=45, inclusive); <br />5. Section 00800- Supplementary Conditions (pages 00800=1 to 00800-18, inclusive); <br />6. Specifications as listed in the Table of Contents; <br />7. Drawings consisting of following sheets, with each sheet bearing the following general title: <br />"Wabasso Beach Park Restoration", <br />C-1 through C-6; <br />U-1 through U-9; <br />A0.109 AS0.10, A1.109 A2.10, A2.209 A2.219 A2.309 A2.409 A3.109 A3.111 A4.109 A4.209 <br />A5.10, A6.10; <br />S-1 through S-4; <br />E1.009 E1.01, E1.029 E1.10, E2.009 E3.00, E3.10; <br />Last Revision 12/2007 00520- 6 Wabasso Beach Pk. Restoration <br />F:\Public Works\Cliff Suthard\Wabasso Beach ParkW Construction Bid Documents\Bid Documents as of 1-9-2008\Div 0 -AS OF 1-8- <br />2008\00520 - Agreement (Public Works).doc <br />