Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7472
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. The Contract Times will commence to run on the Price and subdivides the Work into component parts <br /> thirtieth day after the Effective Date of the Agreement or, if in sufficient detail to serve as the basis for progress <br /> a Notice to Proceed is given, on the day indicated in the payments during performance of the Work. Such <br /> Notice to Proceed. A Notice to Proceed may be given at prices will include an appropriate amount of <br /> any time within 30 days after the Effective Date of the overhead and profit applicable to each <br /> item of <br /> Agreement. In no event will the Contract Times commence Work, <br /> to run later than the sixtieth day after the day of Bid opening <br /> or the thirtieth day after the Effective Date of the Paragraph 2.05.0 has been deleted and replaced with a <br /> Agreement, whichever date is earlier. new paragraph. See the Supplementary Conditions. <br /> 2 .04 Starting the Work Site is staiied3 GQi QRAGTQR a QVRsIE4 sba eaA <br /> ' V4& eepies <br /> A. CONTRACTOR shall start to perform the Work <br /> on the date when the Contract Times commence to run. No kiss anee(and etlff evideme of insufanee which efthef 0 <br /> Work shall be done at the Site prior to the date on which the *'' m of any additiem4 kyyufed "" <br /> " ' r-easenably request) <br /> Contract Times commence to run. whieh COI�FI AG'I OR and O-WIAlER e ee&ely <br /> afe <br /> 2 .05 Before Starting Construction Aitiole 5 . <br /> A. CONTRACTOR 's Review of Contract Documents : Paragraph 2.06.A has been deleted and replaced with a <br /> Before undertaking each part of the Work, new paragraph. See the Supplementary Conditions. <br /> CONTRACTOR shall carefully study and compare the 2 .06 Preconstruction Conference <br /> Contract Documents and check and verify pertinent figures <br /> therein and all applicable field measurements. A Widiia 20 days afteF the Gent et Taws staA <br /> CONTRACTOR shall promptly report in writing to <br /> ENGINEER any conflict, error, ambiguity, or discrepancy <br /> which CONTRACTOR may discover and shall obtain a <br /> written interpretation or clarification from ENGINEER uf1demtanding affieftg the parfies as to the Work and <br /> 4e <br /> before proceeding with any Work affected thereby; <br /> however, CONTRACTOR shall not be liable to OWNER <br /> or ENGINEER for failure to report any conflict, error, submittals, pplie ~ ""s £" D". e.,+ <br /> ambiguity, or discrepancy in the Contract Documents unless <br /> CONTRACTOR knew or reasonably should have known <br /> 2 . 07 Initial Acceptance of Schedules <br /> thereof. <br /> B . Preliminary Schedules: Within ten days after the A. Unless otherwise provided in the Contract Docu- <br /> Effective Date of the Agreement (unless otherwise specified ments, at least ten days before submission of the first <br /> in the General Requirements), CONTRACTOR shall Application for Payment a conference attended by CON- <br /> submit to ENGINEER for its timely review: TRACTOR, ENGINEER, and others as appropriate will be <br /> held to review for acceptability to ENGINEER as provided <br /> 1 . a preliminary progress schedule indicat- below the schedules submitted in accordance with <br /> ing the times (numbers of days or dates) for starting paragraph 2 .05 .B . CONTRACTOR shall have an <br /> and completing the various stages of the Work, additional ten days to make corrections and adjustments and <br /> including any Milestones specified in the Contract to complete and resubmit the schedules. No progress <br /> Documents; payment shall be made to CONTRACTOR until acceptable <br /> schedules are submitted to ENGINEER. <br /> 2 , a preliminary schedule of Shop Drawing <br /> and Sample submittals which will list each required 1 . The progress schedule will be acceptable <br /> submittal and the times for submitting, reviewing, to ENGINEER if it provides an orderly progression <br /> and processing such submittal; and of the Work to completion within any specified <br /> New sentence has been added at the end of paragraph Milestones and the Contract Times. Such accep- <br /> 2 .05.B.3. See the Supplementary Conditions. tance will not impose on ENGINEER responsibility <br /> 3 * a preliminary schedule of values for all of for the progress schedule, for sequencing, schedul- <br /> the Work which includes quantities and prices of ing, or progress of the Work nor interfere with or <br /> items which when added together equal the Contract <br /> Rev . 03 / 2006 Egret Marsh <br /> 00700 - 10 <br />