My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (3)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:38:00 AM
Creation date
10/1/2015 12:21:15 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7472
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
under the terms and conditions governing final payment, <br /> B . Review of Application and Acceptance except that it shall not constitute a waiver of Claims. <br /> 1 . If, on the basis of ENGINEER' s observa- 14 . 09 Waiver of Claims <br /> tion of the Work during construction and final <br /> inspection, and ENGINEER' s review of the final Paragraph 14.09 has been deleted and replaced in its <br /> Application for Payment and accompanying docu- entirety with a new paragraph. See the Supplementary <br /> mentation as required by the Contract Documents, Conditions. <br /> ENGINEER is satisfied that the Work has been A. 44e making and aeceptame of fiw4 paynwi# <br /> completed and CONTRACTOR' s other obligations eens6w4e: <br /> under the Contract Documents have been fulfilled, <br /> ENGINEER will, within ten days after receipt of the i , a waivef ef ., n Glak-... by Q4NE� <br /> final Application for Payment, indicate in writing against G9 d11�81�- except rsn� <br /> ENGINEER' s recommendation of payment and fmm wisetfied Liens, <br /> &em defeetive Work appear- <br /> present the Application for Payment to OWNER for <br /> payment. At the same time ENGINEER will also 14 . 06, <br /> give written notice to OWNER and CON- <br /> TRACTOR that the Work is acceptable subject to speelfied— dwFein, of i£em—GQAW "��s <br /> the provisions of paragraph 14 .09 . Otherwise, <br /> ENGINEER will return the Application for Payment <br /> to CONTRACTOR, indicating in writing the reasons <br /> for refusing to recommend final payment, in which 2 . a vvaiveF of a4l Glai ,m by G09RAG <br /> r <br /> case CONTRACTOR shall make the necessary WR agakwA OWNER other than these pfevieus <br /> corrections and resubmit the Application for ffede in wFifing whieh are still anseWed. <br /> Payment. <br /> Paragraph 14.07.C.1 has been deleted and replaced with ARTICLE 15 - SUSPENSION OF WORK AND <br /> a new paragraph. See the Supplementary Conditions. TERMINATION <br /> C. Payment Becomes Due <br /> 15 .01 OWNER May Suspend Work <br /> CIRPMER of the Applievatim� f r Payment m. <br /> The last sentence of Paragraph 15.01 .A has been deleted <br /> and replaced with new sentences. See the <br /> when due wiN be paid by OWNER to CON Supplementary Conditions. <br /> `''D "� A. At any time and without cause, OWNER may <br /> suspend the Work or any portion thereof for a period of not <br /> 14.08 Final Completion Delayed more than 90 consecutive days by notice in writing to CON- <br /> TRACTOR and ENGINEER which will fix the date on <br /> A. If, through no fault of CONTRACTOR, final which Work will be resumed. CONTRACTOR shall <br /> completion of the Work is significantly delayed, and if resume the Work on the date so fixed. COMPRACTOR <br /> ENGINEER so confirms, OWNER shall, upon receipt of <br /> shall be allowed an adjustment in the Gentmet Pr-iee er- <br /> CONTRACTOR' s final Application for Payment and <br /> recommendation of ENGINEER, and without terminating agFibutable to any saah suspension if GQbn2RAGT-QR <br /> the Agreement, make payment of the balance due for that . <br /> portion of the Work fully completed and accepted. If the <br /> remaining balance to be held by OWNER for Work not 15 .02 OWNER May Terminate for Cause <br /> fully completed or corrected is less than the retainage <br /> stipulated in the Agreement, and if Bonds have been A. The occurrence of any one or more <br /> of the <br /> furnished as required in paragraph 5 .01 , the written consent following events will justify termination for cause : <br /> of the surety to the payment of the balance due for that <br /> portion of the Work fully completed and accepted shall be 1 . CONTRACTOR' s persistent failure to <br /> submitted by CONTRACTOR to ENGINEER with the perform the Work in accordance with the Contract <br /> Application for such payment. Such payment shall be made Documents (including, but not limited to, failure to <br /> supply sufficient skilled workers or suitable materi- <br /> Rev . 03 / 2006 Egret Marsh <br /> 00700 - 43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.