Laserfiche WebLink
4 . Supplementary Conditions to the General Conditions <br /> 5 , General Conditions <br /> 6 , Approved Shop Drawings <br /> 7 , Drawings <br /> 8 , Referenced Standards . <br /> B . Written/computed dimensions shall govern over scaled dimensions . <br /> SC -4. 02 Subsurface and Physical Conditions <br /> SC-4 . 02 Add the following new paragraphs immediately after paragraph GC4. 02. 8: <br /> C . In the preparation of Drawings and Specifications , ENGINEER or ENGINEER' s <br /> Consultants relied upon the following reports of explorations and tests of <br /> subsurface conditions at the Site : <br /> 1 . Report dated October 11 , 2007 Prepared by A. M . Engineering and Testing , <br /> Inc. , entitled " GEOTECHNICAL ENGINEERING SERVICES WABASSO <br /> BEACH PARK RESTORATIONS INDIAN RIVER COUNTY, FLORIDA <br /> PROJECT NO , PSL 193513- 1 consisting of 18 pages . <br /> 2 . Report dated January 2007 , Prepared by Thomas E . Penders , RPA, Thomas <br /> Penders and Associates , 3365 Heather Drive , Titusville , Florida 32796 , <br /> entitled " SUMMARY OF FINDINGS : WABASSO BEACH PARK <br /> RESTORATION AREA ARCHAEOLOGICAL SURVEY" , consisting of 15 <br /> pages . <br /> �r <br /> D . Reports and drawings itemized in SC4 . 02 . 0 and SC4 . 02 . D are not included with <br /> the Bidding Documents . Copies may be examined at office of the Public Works <br /> office 4375 43rd Ave . Vero Beach , Fl , during regular business hours . These reports <br /> and drawings are not part of the Contract Documents . <br /> SC -4.03 Differing Subsurface or Physical Conditions <br /> SC4 . 03 . C . 3 Delete the following text from the second sentence of paragraph GC-4. 03. C. 3: <br /> r <br /> SC -4.06 Hazardous Environmental Conditions at Site <br /> SC-4 . 06 . G Delete paragraph GC-4. 06. G in its entirety. <br /> SC-4 , 06 , H Delete paragraph GC-4. 06. H in its entirety. <br /> SC -5.01 Performance, Payment and Other Bonds <br /> SC-5 . 01 . A. Delete paragraph GC-5. 01 .A in its entirety and insert the following paragraph in its <br /> place: <br /> A. Within ten ( 10 ) days of receipt of the Contract Documents for execution , the <br /> CONTRACTOR shall furnish a Performance Bond in an amount equal to 125 % of <br /> the Contract Price and a Payment Bond in an amount equal to 100 % of the <br /> Contract Price . <br /> 1 . The CONTRACTOR shall provide two separate bonds . A combined <br /> Payment and Performance Bond for 125% of the Contract Price is not an <br /> acceptable substitute . <br /> Last Revised 12/2007 00800- 5- Wabasso Beach Pk , Restoration <br /> FAPublic Works\Cliff Suthard\Wabasso Beach ParkW Construction Bid Documents\Bid Documents as of 1 -9-2008\Div 0 AS OF 1 -8- <br /> 2008\00800 - Supplementary Conditions.doc <br />