My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (3)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:38:00 AM
Creation date
10/1/2015 12:21:15 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7472
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
not be permitted without prior written permission and approval from the <br /> ENGINEER. <br /> 3 , The CONTRACTOR shall receive no additional compensation for overtime work , <br /> i . e . , work in excess of eight hours in any one calendar day or 40 hours in any one <br /> calendar week , even though such overtime work may be required under <br /> emergency conditions and may be ordered by the ENGINEER in writing . <br /> 4 . All costs of inspection and testing performed during overtime work by the <br /> CONTRACTOR, which is allowed solely for the convenience of the <br /> CONTRACTOR, shall be borne by the CONTRACTOR, and a credit given to the <br /> OWNER to deduct the costs of all such inspection and testing from any <br /> payments otherwise due the CONTRACTOR. <br /> 5 . All costs of OWNER's employees and costs of ENGINEER's Consultant resulting <br /> from overtime work by the CONTRACTOR , which is allowed solely for the <br /> convenience of the CONTRACTOR, shall be borne by the CONTRACTOR, and a <br /> credit given to OWNER to deduct all such costs from any payments otherwise <br /> due the CONTRACTOR . <br /> 6 . No work shall commence before 7 a . m . or continue after 7 p . m . except in case of <br /> emergency upon specific permission of the ENGINEER . <br /> 7 . No work shall be performed on Saturday or Sunday without prior written <br /> permission and approval from the ENGINEER. <br /> SC-6 . 05 Substitutes and "Or-Equals " <br /> SC-6 . 05 .A Delete paragraph GC-6. 05.A in its entirety and insert the following in its place: <br /> A. Whenever an item of material or equipment is specified or described in the Con- <br /> tract Documents by using the name of a proprietary item or the name of a <br /> particular Supplier, that proprietary item or particular Supplier shall be used and no <br /> other will be considered . If the specification or description contains or is followed <br /> by words such as "equivalent' or "or-equal , " then the specification or description is <br /> intended to establish the type , function , appearance , and quality required . In such <br /> case , substitution of other items of material or equipment or material or equipment <br /> of other Suppliers may be submitted to ENGINEER for review under the circum- <br /> stances described below. <br /> SC-6 . 05 .A. 1 . a . (ii ) Delete sentence GC-6, 05.A. 1 . a. (ii) in its entirety and insert the following in <br /> its place: <br /> ( ii ) it will reliably perform at least equally well the function of the named item of <br /> material or equipment, and ; <br /> SC -6 . 06 Concerning Subcontractors , Suppliers, and Others <br /> SC-6 . 06 . C . Add the following sentence at the end of paragraph GC-6. 06. C: <br /> Pursuant to Florida Statutes section 255 . 05( 1 ) (a ) (2005) , any claimant (as such term is <br /> defined in Florida Statutes section 713 . 01 ) may apply to Indian River County as Owner for <br /> irr copies of the Agreement and the recorded payment and performance bonds and shall <br /> thereupon be furnished with certified copies of such documents . <br /> SC -6 . 08 Permits <br /> g SC-6 . 08 Add the following paragraphs immediately after paragraph GC-6. 08.A : <br /> Last Revised 12/2007 00800- 9- Wabasso Beach Pk . Restoration <br /> F:\Public Works\Cliff Suthard\Wabasso Beach Park\A construction Bid Documents\Bid Documents as of 1 -9-2008\Div 0 AS OF 1 -8- <br /> 2008\00800 - Supplementary Conditions.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.