My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (3)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:38:00 AM
Creation date
10/1/2015 12:21:15 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7472
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e <br /> Storage tanks shall be located where they will not be subjected to flooding or washout. Fueling activities <br /> shall be limited to upland areas - no fueling or transfer of petroleum products shall take place on the beach <br /> M - Protection of Fish and Wildlife Resources: The CONTRACTOR shall keep construction activities under <br /> surveillance, management and control to minimize interference with, disturbance to and damage of fish and <br /> wildlife. <br /> N - Protection of Air Resources : The CONTRACTOR shall keep construction activities under surveillance, <br /> management and control to minimize pollution of air resources . All activities, equipment, processes and <br /> work operated or performed by the CONTRACTOR in accomplishing the specified construction shall be in <br /> strict accordance with the applicable air pollution standards of the State of Florida (Florida Statute, Chapter <br /> 403 and others) and all Federal emission and performance laws and standards. <br /> O - Protection of Sound Intrusions : The CONTRACTOR shall keep construction activities under surveillance <br /> and control to minimize damage to the environment by noise. <br /> P - Maintenance of Pollution Control Facilities : The CONTRACTOR shall maintain all constructed facilities <br /> and portable pollution control devices for the duration of the contract or for that length of time construction <br /> activities create the particular pollutant. <br /> Q - Training of CONTRACTOR Perso <br /> nnel in Pollution Control: The CONTRACTOR shall train its personnel in <br /> all phases of environmental protection. The training shall include methods of detecting and avoiding <br /> pollution, familiarization with pollution standards, both statutory and contractual and installation and care of <br /> facilities to insure adequate and continuous environmental pollution control. Quality control and <br /> supervisory personnel shall be thoroughly trained in the proper use of monitoring devices and abatement <br /> equipment and shall be thoroughly knowledgeable of Federal, State and local laws, regulations and permits. <br /> R - Payment: The cost of the work covered under this section (Environmental Protection) and all costs in <br /> connection therewith shall be included in the contract lump sum price for Bid Item 1 . 01 and 1 . 05 — <br /> Mobilization and Demobilization. <br /> Reference : Item 2413 - Irrigation Watering Schedule : <br /> e <br /> F :\Public Works\Cliff Suthard\Wabasso Beach Park\A Construction Bid Documents\Bid Documents as of 2-6-2008\Addendum # 1 #21 #3 , #4 , & <br /> #5\ADDENDUM #2 AND ATTACHMENTS\Addendum #2 . doc Page 11 of 11 <br /> Rev . 3- 12-08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.