My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (3)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:38:00 AM
Creation date
10/1/2015 12:21:15 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7472
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A . M . ENGINEERING AND TESTING, INC . <br /> - Geotechnical Exploration for Proposed Restrooms and Boardwalk <br /> Wabasso Beach Park, Indian River County, Florida <br /> ., Project No , PSL1935B4 <br /> We have not received any information regarding loading for the structures . We assume that the <br /> maximum column and wall loads will be 20 kips and 3 kips per linear foot, respectively . <br /> If the actual loads are substantially larger than those estimated or the elevations are different, A. <br /> M . Engineering should be advised promptly so that we can review our recommendations and <br /> revise them if necessary. <br /> FIELD EXPLORATIONS <br /> The subsurface conditions at the project site were explored on September 27 and October 1 , <br /> 2007 , with five (5) Standard Penetration Test (SPT) borings. The SPT borings were performed in <br /> t general compliance with ASTM D 1586 , "Penetration Test and Split-Barrel Sampling of Soils" . <br /> The approximate locations of the explorations are noted on the Boring Location Plan. Boring <br /> logs presenting the visual classification of the soil samples obtained from the borings are <br /> attached at the end of this report. The depths indicated on the boring logs are below the ground <br /> surface at the time the borings were completed. <br /> FINDINGS <br /> The terrain at the project site appeared to generally match the topographic map provided to us. <br /> Vegetation at the site included sea oats . A three-story Disney resort structure was located to the <br /> south. The Atlantic Ocean was to the east. Based on the site plan elevations , we estimate that the <br /> locations of the restrooms and boardwalk had ground surface elevations of + 15 to + 16 feet <br /> NGVD . <br /> The subsurface soils encountered in the borings generally consisted of sand with negligible silt <br /> and varying amounts of shell fragments to the maximum boring depth of 40 feet . The SPT N- <br /> values (blow counts) indicated that the sands were generally loose to firm to depths of <br /> approximately 14 feet and then dense to very dense to the boring termination depths of 16 , 30 , <br /> and 40 feet. <br /> The ground water table was not able to be readily determined in the borings . However, ground <br /> water was encountered at 15 feet below the existing grade in the boring SPT- 5 . We anticipate <br /> that the water table will normally be at elevation +2 feet, and that it will fluctuate with the tides <br /> and ocean conditions . <br /> LV <br /> r . <br /> 2 <br /> rr <br />
The URL can be used to link to this page
Your browser does not support the video tag.