My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (3)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:38:00 AM
Creation date
10/1/2015 12:21:15 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7472
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A . M . ENGINEERING AND TESTING , INC . <br /> Geotechnical Exploration for Proposed Restrooms and Boardwalk <br /> Wabasso Beach Park, Indian River County, Florida <br /> Project No . PSL1935B- 1 <br /> We recommend that the project specifications for the piles follow the relevant sections of "The <br /> Augered Caston-Place Pile Model Specification" published by the Deep Foundations Institute . A <br /> summary of important installation criteria is presented in Attachment B . An experienced <br /> inspector should monitor the installation of the piles so that these criteria are followed . <br /> Site Preparation Recommendations - Pile Supported Structure <br /> The building pads should be compacted in accordance with the general site preparation <br /> procedures in Attachment A, except that only the upper foot of soil needs to be compacted to at <br /> least 95 percent of the modified Proctor maximum dry density (ASTM D1557) . The fill for the <br /> foundation pads should comply with the indications in Section IV of Attachment A. <br /> i.. <br /> FOUNDATION RECOMMENDATIONS (BOARDWALK) <br /> The boardwalk will be supported on 6 inch square timber piles. Entrance ramps to the boardwalk <br /> will be supported on shallow footings . Recommendations for soil parameters for timber pile <br /> design are presented in Table 1 . Final pile design will be by a Specialty Engineer. To achieve a <br /> required embedment depth, jetting or predrilling may be required due to dense sand . The pile <br /> must be driven to the required capacity after predrilling or jetting to the required depth. <br /> TABLE 1 : TIMBER PILE DESIGN PARAMETERS <br /> Modulus of Lateral <br /> Subgrade Reaction <br /> Soil Soil Soil Active Passive k ci <br /> Unit Unit Weight Friction Earth Earth Above the Below the <br /> Depth Weight (submerged) Angle Pressure Pressure Water Water <br /> (feet) * (pct) (pef) (0) (Ka) (IQ Table Table <br /> 0 - 2 110 57 . 6 30 0 .333 3 . 00 90 60 <br /> 2 - 12 105 42 . 6 29 0 . 347 2 . 88 25 20 <br /> 12 — 13 '/Z 110 47 . 6 31 0 .320 3 . 12 90 60 <br /> 13 %2 — 15 115 52 . 6 34 0 .283 3 . 54 90 60 <br /> 18 %2 — 20 125 6206 40 0 .217 4. 60 225 125 <br /> 23V2 — 25 125 62 . 6 41 0 .208 4. 81 225 125 <br /> 28 %2 — 30 125 62 . 6 39 0 .228 4 . 40 225 125 <br /> 33 !/2, — 35 120 57 . 6 37 0 .249 4 . 02 225 125 <br /> 38V2 - 40 110 47 . 6 31 0 . 320 3 . 12 90 60 <br /> *Below top of boring elevation, approximately + 16 feet NGVD . <br /> k <br /> 3 <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.