My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (4)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:41:08 AM
Creation date
10/1/2015 12:21:49 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7473
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Charlie Crist <br /> 161, Florida Department of Governor <br /> Environmental Protection Jeff Kottkamp <br /> FLQ A Lt. Governor <br /> /�i Central District <br /> 3319 Maguire Boulevard, Suite 232 Michael W. Sole <br /> Orlando, Florida 32803 -3767 Secretary <br /> September 4, 2007 <br /> Indian River County Public Works Department <br /> 1840 25th Street <br /> Vero Beach, Florida 32960 <br /> Attention: Jim Davis, Director <br /> Indian River County - ERP <br /> Wabasso Beach Park Restoration <br /> Dear Mr. Davis : <br /> The Department of Environmental Protection has received and reviewed the information submitted <br /> on your behalf by Coastal Technology on July 2, 2007, regarding a permit determination for the <br /> proposed restoration of the Wabasso Beach Park. The park is located east of the coastal construction <br /> control line on the east side of A1A at Wabasso Road (CR 510) in Indian River County . The project <br /> proposes to repair, replace, and remodel amenities at the park that were damaged by hurricanes <br /> Frances and Jeanne in 2004 . The site is approximately 2 . 5 acres total size and the proposed work will <br /> result in a net reduction in impervious surface of approximately 355 square feet. Stormwater runoff <br /> will continue to be handled by the existing system at the park. Based on the information submitted, <br /> the proposed project appears to be exempt from the requirements for a stormwater management <br /> facility in accordance with Chapter 403 .813 (2) (q), Florida Statutes (F .S. ), and 40C42 . 0225, Florida „ <br /> Administrative Code (F . A.C .) . <br /> If in the future, either conditions of the proposed project change or Department rules change, it may <br /> be determined that an environmental resource permit is required . <br /> Neither this letter nor any prior agreement with the Department relieves you of the responsibility of <br /> complying with any applicable ordinances, rules, or laws of any local, county, state, or federal <br /> government entity . <br /> Please contact me at 407-893-7874 if you have questions or need further information. <br /> Sincerely, <br /> Debra Laisure, P. E . <br /> Engineering Support <br /> Submerged Lands and Environmental <br /> Resources Program <br /> cc : Pati B . Gattis, Coastal Technology Corp . <br /> "More Protection, Less Process " <br /> www. dep. state ft us 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.