My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (4)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:41:08 AM
Creation date
10/1/2015 12:21:49 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7473
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item 1 - Response to RFI received subsequent to the issuance of ADDENDUM #2 : <br /> 1 . THE PLANS STATE DON ' T DISTURB DISNEY'S LANDSCAPE , THE 2 " P . E . WATER LINE IS <br /> GOING RIGHT THROUGH THE LANDSCAPE AREA. PLEASE CLARIFY IF THIS AREA IS IN <br /> THE ROW OR IF IT IS DISNEY PROPERTY . <br /> This area is located within the ROW, the CONTRACTOR shall install the 2 " P. E. water line to avoid <br /> Disney landscaping located within the ROW to the extent practical. <br /> 2 . THE LEGEND ON SHEET C2 SHOWNS A HATCH PATTERN FOR PARKING LOT <br /> RESTORATION , BUT THIS HATCH PATTERN IS NOT SHOWN IN THE PLAN LAYOUT . <br /> PLEASE CLARIFY THE AREAS THAT THIS HATCH PATTERN IS REFERRING TOO . <br /> See sheet C3 for all proposed pavement. <br /> 3 . THE PLANS CALL FOR THE CONTRACTOR TO PLANT NATIVE DUNE VEGETATION . IS <br /> THERE GOING TO BE BEACH NOURISHMENT BEFORE THE CONTRACTOR PLANTS <br /> VEGETATION ? <br /> Beach restoration (by others) may or may not occur prior to native dune planting, however the <br /> extent of native dune vegetation required will not change. <br /> 4 . PLEASE CLARIFY HOW THICK THE STABILIZED SUBGRADE IS . <br /> The CONTRACTOR shall provide adequate stabilized subgrade to meet the minimum compaction <br /> specifications as noted on the drawings and technical specifications. <br /> 5 . PLEASE CLARIFY IF THE 2 . 5 " OF ASPHALT INCLUDES THE 1 " OVERLAY . <br /> The 2. 5 " of asphalt includes the 1 inch of overlay. <br /> 6 . PLEASE CLARIFY THE NUMBER & THICKNESS OF ASPHALT LIFTS . <br /> Two lifts, 1 . 5 inch, and 1, inch or as prescribed by FDOT specifications. <br /> 7 . THE PHONE NUMBER IN ITEM 1 , # 1 , OF ADDENDUM #2 , IS WRONG . <br /> The correct number is 800- 762-5002. <br /> r <br /> FAPublic Works\Cliff Suthard\Wabasso Beach Park\A Construction Bid Documents\Bid Documents as of 2-6-2008\Addendum #1 #2 , #3, #4, & <br /> #5\Addendum #3 .doc <br /> Page 2 of 2 <br /> 40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.