My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (4)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:41:08 AM
Creation date
10/1/2015 12:21:49 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7473
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01210 <br /> PRECONSTRUCTION CONFERENCE <br /> 1 . 1 SCOPE <br /> A . Date , Time and Location : The Conference will be held after execution of the <br /> Agreement and before construction is started at the site . ENGINEER will fix the <br /> date , time , and location of the meeting in accordance with the General <br /> Conditions . <br /> Be ENGINEER or OWNER Is representative shall prepare agenda , preside at <br /> meeting , and prepare and distribute a transcript of proceedings to all parties . <br /> C . CONTRACTOR shall provide data required , contribute appropriate items for <br /> discussion , and be prepared to discuss all items on agenda . <br /> 1 . 2 REQUIRED ATTENDANCE <br /> A . CONTRACTOR and major subcontractors . <br /> Be OWNER's representative . <br /> C . ENGINEER and E.NGINEER' s CONSULTANT <br /> D . Representatives of utilities and governmental permit agencies having any degree <br /> of concern , control , or responsibility , if available . <br /> 1 . 3 AGENDA <br /> A . Agenda will include , but will not necessarily be limited to , the following : <br /> 1 . Designation of responsible personnel . <br /> 2 . Subcontractors . <br /> 3 . Coordination with other contractors . <br /> 4 . Progress schedule . <br /> 5 . Utility Concerns — Utility representatives as available . <br /> a . Florida Power & Light <br /> b . Indian River County , Division of Utility Services <br /> c . Bell South <br /> 6 , Shop Drawings . <br /> 7 . Processing of Field Orders and Change Orders , <br /> 8 . Requirements for copies of Contract Documents . <br /> Last Revised 12/2007 01210- 1 Wabasso Beach Pk Restoration <br /> FAPublic Works\Cliff Suthard\Wabasso Beach Park\A Construction Bid Documents\Bid Documents as of 1 -9-2008\Technical <br /> Specifications\Div 1 \01210 - Preconstruction Conference.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.