Laserfiche WebLink
SECTION 01210 <br /> PRECONSTRUCTION CONFERENCE <br /> 1 . 1 SCOPE <br /> A . Date , Time and Location : The Conference will be held after execution of the <br /> Agreement and before construction is started at the site . ENGINEER will fix the <br /> date , time , and location of the meeting in accordance with the General <br /> Conditions . <br /> Be ENGINEER or OWNER Is representative shall prepare agenda , preside at <br /> meeting , and prepare and distribute a transcript of proceedings to all parties . <br /> C . CONTRACTOR shall provide data required , contribute appropriate items for <br /> discussion , and be prepared to discuss all items on agenda . <br /> 1 . 2 REQUIRED ATTENDANCE <br /> A . CONTRACTOR and major subcontractors . <br /> Be OWNER's representative . <br /> C . ENGINEER and E.NGINEER' s CONSULTANT <br /> D . Representatives of utilities and governmental permit agencies having any degree <br /> of concern , control , or responsibility , if available . <br /> 1 . 3 AGENDA <br /> A . Agenda will include , but will not necessarily be limited to , the following : <br /> 1 . Designation of responsible personnel . <br /> 2 . Subcontractors . <br /> 3 . Coordination with other contractors . <br /> 4 . Progress schedule . <br /> 5 . Utility Concerns — Utility representatives as available . <br /> a . Florida Power & Light <br /> b . Indian River County , Division of Utility Services <br /> c . Bell South <br /> 6 , Shop Drawings . <br /> 7 . Processing of Field Orders and Change Orders , <br /> 8 . Requirements for copies of Contract Documents . <br /> Last Revised 12/2007 01210- 1 Wabasso Beach Pk Restoration <br /> FAPublic Works\Cliff Suthard\Wabasso Beach Park\A Construction Bid Documents\Bid Documents as of 1 -9-2008\Technical <br /> Specifications\Div 1 \01210 - Preconstruction Conference.doc <br />