My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (4)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:41:08 AM
Creation date
10/1/2015 12:21:49 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7473
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item 1 - Response to RFI received subsequent to the issuance of ADDENDUM #3 : <br /> 1 . ARE THE SIDEWALKS AND PARKING LOTS FOR BOPPY' S AND THE REAL ESTATE GOING <br /> TO STAY , AS IS , OR ARE THEY COMING OUT? <br /> The sidewalks are to stay as is, and CONTRACTOR will be responsible for making a smooth <br /> transition from the parking lot and sidewalk apron to the existing sidewalk. <br /> 2 . SUPPLEMENTARY CONDITION 17 . 14 — MINIMUM PERCENTAGE OF WORK TO BE <br /> PERFORMED BY CONTRACTOR - STATES THE CONTRACTOR MUST PERFORM AT LEAST <br /> 51 % OF THE WORK WITH ITS OWN PERSONNEL AND EQUIPMENT , PLEASE PROVIDE <br /> CLARIFICATION OF THE INTENT OF THE OWNER AS WE WOULD BE UNABLE TO ADHERE <br /> TO THIS CONDITION , BUT WOULD LIKE TO BID THE PROJECT AND HAVE BEEN WORKING <br /> FEVERISHLY TO ASSEMBLE OUR PROPOSAL . <br /> In the CONDITIONS OF THE CONTRACT, Section 00800 Supplementary Conditions to the General <br /> Conditions, Article SC47. 14 Minimum Percentage of Work to be Performed by CONTRACTOR, <br /> DELETE THAT ARTICLE. <br /> 3 . THE FOLLOWING WAS RECEIVED FROM A BIDDER ; " I SPOKE WITH CATHY KEMP THIS <br /> AFTERNOON . ( 772-489-6254 ) SHE IS THE SERVICE PLANNER FOR FPL FOR THIS SITE . <br /> SHE INDICATED THEFOLLOWING : <br /> THERE IS NO 3 PHASE POWER ON THE POLES ON THE NORTH SIDE OF THE PROPERTY . <br /> THE ONLY WAY TO GET 3 PHASE TO THE NW CORNER IS TO COME ACROSS SR A1A, <br /> WHICH WOULD REQUIRE DOT PERMIT , LENGTHY PROCESS , ACCORDING TO CATHY . <br /> AN OPTION FOR LIFT STATION 3 PHASE WOULD BE TO COME FROM THE CONCRETE <br /> POLE NEXT TO THE SIDEWALK BETWEEN BOPPY ' S AND THE REALESTATE OFFICE . SHE <br /> SAID FEES WOULD BE REQUIRED FOR THE TRANSFORMERS AND LABOR . HOW MUCH : <br /> SHE DIDN 'T KNOW . ANOTHER QUESTION FROM MY END WOULD BE , CAN WE RUN <br /> UNDERGROUND THRU THE REAL ESTATE PARKING LOT?" <br /> I j <br /> FPL has already been requested to extend 3-phase power to the power pole shown on the plans, <br /> see sheet U- 8a and the attached service request. It should also be noted that there is no platted <br /> easement between lots 4 and 5 (Boppy's and the Office building), nor do we have any authorization <br /> to install utilities through the private parking lot. <br /> FAPublic Works\Cliff Suthard\Wabasso Beach Park\A Construction Bid Documents\Bid Documents as of 2-6-2008\Addendum #1 #2 , #3 , #4 , & <br /> #5\Addendum #4.doc <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.