My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (4)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:41:08 AM
Creation date
10/1/2015 12:21:49 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7473
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Commercial and Industrial Project Checklist <br /> FIPL <br /> Service Details Additional Electrical Requirements <br /> Wire Size: 60 Main Panel disconnect size (amps) <br /> Number of Sets: 1 Number of meters required <br /> Total Estimated Demand: 8 (kW) Meter address / designation (suite , unit, apt, etc) <br /> Total A/C Square Footage: N /A YES Lift Station (Yes / No) <br /> Number of A/C Unitsa 0 size tons <br /> Other electrical needs <br /> This service is for a county owned lift station only . <br /> Please Include the below required Information in (mMdd/yy) format. <br /> 1 ) Clearing , Site Work, Water & Sewer MaV 2008 3) Installation completed by: I AU ust 2008 <br /> 2) FPL design layout by: I 6Dril 20 8 4) Desired date for Permanent Service I AU USt 20 8 <br /> 6 Installation of FPL Construction Material I <br /> RCustomer to install : all FPL facilities for credit Directional Bores for crossing under roadways or environmental areas to get Into project <br /> FPL to Install all of its facilities Customer to directional bore Yes: N0: El 8 FPL to directional bore Yes: <br />BNo: <br /> 7 Easement ; <br /> X Platted: Yes: X No; <br /> Specific: Yes: No: <br /> Utility: Yes; No: <br /> Final Plat recorded by: I Already Platted (date) <br /> Other <br /> Are there any existing FPL facilities in conflict with proposed construction & critical dates for relocation or removal? <br /> Explain: <br /> Are there any special construction requirements / restrictions. (Use construction entrance only, no weekend work or <br /> work outside of normal working hours)? <br /> Explain: <br /> ® Are there existing buildings on-site to remain in operation during construction? <br /> Explain: Existing 1 phase service lines need to be maintained during 3 phase installation . <br /> ® Are there existing overhead power lines and/or service lines that need to be removed and/or abandoned? <br /> Explain: Existing single phase service to existing pole . Need 3 phase to existing pole . <br /> Once all above information is received we can begin Design of the Project. <br /> Design Phase = 6 - 8 weeks <br /> Scheduling Phase = 3 weeks <br /> Construction Phase = dependent on the scope of the project <br /> Please send completed form and CAD file to your Area CFM <br /> Please contact your Area CPM for assistance <br /> Will <br /> h <br />
The URL can be used to link to this page
Your browser does not support the video tag.