Laserfiche WebLink
Commercial and Industrial Project Checklist <br /> FIPL <br /> Service Details Additional Electrical Requirements <br /> Wire Size: 60 Main Panel disconnect size (amps) <br /> Number of Sets: 1 Number of meters required <br /> Total Estimated Demand: 8 (kW) Meter address / designation (suite , unit, apt, etc) <br /> Total A/C Square Footage: N /A YES Lift Station (Yes / No) <br /> Number of A/C Unitsa 0 size tons <br /> Other electrical needs <br /> This service is for a county owned lift station only . <br /> Please Include the below required Information in (mMdd/yy) format. <br /> 1 ) Clearing , Site Work, Water & Sewer MaV 2008 3) Installation completed by: I AU ust 2008 <br /> 2) FPL design layout by: I 6Dril 20 8 4) Desired date for Permanent Service I AU USt 20 8 <br /> 6 Installation of FPL Construction Material I <br /> RCustomer to install : all FPL facilities for credit Directional Bores for crossing under roadways or environmental areas to get Into project <br /> FPL to Install all of its facilities Customer to directional bore Yes: N0: El 8 FPL to directional bore Yes: <br />BNo: <br /> 7 Easement ; <br /> X Platted: Yes: X No; <br /> Specific: Yes: No: <br /> Utility: Yes; No: <br /> Final Plat recorded by: I Already Platted (date) <br /> Other <br /> Are there any existing FPL facilities in conflict with proposed construction & critical dates for relocation or removal? <br /> Explain: <br /> Are there any special construction requirements / restrictions. (Use construction entrance only, no weekend work or <br /> work outside of normal working hours)? <br /> Explain: <br /> ® Are there existing buildings on-site to remain in operation during construction? <br /> Explain: Existing 1 phase service lines need to be maintained during 3 phase installation . <br /> ® Are there existing overhead power lines and/or service lines that need to be removed and/or abandoned? <br /> Explain: Existing single phase service to existing pole . Need 3 phase to existing pole . <br /> Once all above information is received we can begin Design of the Project. <br /> Design Phase = 6 - 8 weeks <br /> Scheduling Phase = 3 weeks <br /> Construction Phase = dependent on the scope of the project <br /> Please send completed form and CAD file to your Area CFM <br /> Please contact your Area CPM for assistance <br /> Will <br /> h <br />