Laserfiche WebLink
Piling - 0. 60CCAm, 0. 31CAB, or 0. 25CAC; <br /> wood above ground (stringers, pile caps, handrail rh ENGINEER <br /> benches, etce) 0o <br /> or EcolifeT"' ; <br /> Other treatments which are equivalent may be approved <br /> 6 . POINT : IN PART F OF THE SAME SCHEDULE , YOU ARE CALLING FOR ALL HOT DIPPED <br /> GALVANIZED HARDWARE , WHICH , ON THE OCEAN FRONT WILL NOT HOLDUP MORE THAN <br /> 24 YEARS BEFORE IT HAS RUSTED <br /> ALMOST COMPLETELY , ALL OF YOUR HARDWARE <br /> SHOULD BE TYPE 316 STAINLESS ST <br /> All hardware (nails, screws, bolts, nuts, etc.) shall be Type 316 stainless steel or otherwise approved by <br /> the ENGINEER. <br /> 7 . DOES THE LIFT STATION REQUIRE AN RTU OR A GENERATOR ? <br /> RTU is required. Generator is not required. <br /> Item 2 — In Section 00310 , BID FORM , pages <br /> 1 and 3R. 00310 =3 REPLACE those <br /> pages with the attached pages 00310 1 R and 00310 <br /> Item 3 — In Section 006221 CONTRACTOR' S APPLICATION FOR PAYMENT , pages 006224 , <br /> s with the attached pages 00622 wee, 4R and 00622 — 5R . <br /> and 00622- 5 , REPLACE those page <br /> Item 4 use, In Section 01541 , PROTECTION OF THE WORK AND PROPERTY , page 01541 <br /> REPLACE that page with the attached page 01541 — 1 R. <br /> It <br /> to <br /> I . <br /> Construction Bid Documents\Bid Documents as of 2-6-2008\Addendum # 1 #2 , #3 , #4 , & <br /> F :\Public Works\Cliff Suthard\Wabasso Beach Park\A <br /> #5\Addendum #5 .doc Page 3 of 3 <br />