My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (5)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:43:21 AM
Creation date
10/1/2015 12:22:22 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7474
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
into existingwater bodies, must be installed constructed or, in case of vegetative buffers <br /> g , <br /> protected from disturbance, as a first step in the land alteration process . <br /> E . Working in or Crossing Waterways or Water Bodies : Land alteration and construction <br /> shall be minimized in both permanent and intermittent waterways and the immediately <br /> adjacent buffer of 25 feet from top of bank of the waterways and the buffer area whenever <br /> possible , and barriers shall be used to prevent access . Where in channel work cannot be <br /> avoided, precautions must be taken to stabilize the work area during land alteration, <br /> development and/or construction to minimize erosion. If the channel and buffer area are <br /> disturbed during land alteration, they must be stabilized within three (3 ) calendar days <br /> after the in channel work is completed. <br /> Silt curtains or other filter/siltation reduction devices must be installed on the downstream <br /> side of the in channel alteration activity to eliminate impacts due to increased turbidity. <br /> Whenever stream crossings are required, properly sized temporary culverts shall be <br /> provided by the Contractor and removed when construction completed. The area of the <br /> crossing shall be restored to a condition as nearly as possible equal to that which existed <br /> prior to any construction activity . <br /> F . Swales, Ditches and Channels : All swales, ditches and channel leading from the site shall <br /> be sodded within three (3 ) days of excavation. All other interior swales , etc . , including <br /> detention areas will be sodded prior to substantial completion. <br /> G. Underground Utility Construction: The construction of underground utility lines and other <br /> structures shall be done in accordance with the following standards : <br /> 1 . No more than 100 lineal feet of trench shall be open at any time ; <br /> 2 . Wherever consistent with safety and space consideration, excavated material shall be <br /> cast to the uphill side of trenches. Trench material shall not be cast into or onto the <br /> slope of any stream, channel, road ditch or waterway. <br /> 3 . 03 PERFORMANCE <br /> A. Maintenance : All erosion and siltation control devices shall be checked regularly, <br /> especially after each rainfall and will be cleaned out and/or repaired as required. <br /> B . Compliance : Failure to comply with the aforementioned requirements may result in a fine <br /> and/or more stringent enforcement procedures such as , but not limited to, issuance of a <br /> " Stop Work Order" . <br /> END OF SECTION <br /> 02270 — Erosion Control <br /> 02270 - 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.