My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (5)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:43:21 AM
Creation date
10/1/2015 12:22:22 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7474
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 . Transverse Expansion Joints : One half- inch expansion joints shall be <br /> formed by placing preformed joint filler topped with joint sealant at the ends <br /> of each radius return , around all structures , and at intervals specified in <br /> 3 . 03 D4 below and as shown on the DRAWINGS . <br /> 4 . Spacing of transverse contraction and expansion joints . <br /> Walk , Slab Width Contraction Joint Expansion Joint <br /> Spacinq Spacing <br /> 4 ' 4 ' 40 ' <br /> 5' 5' 40 ' <br /> 6 ' 6 ' 42 ' <br /> 8 ' 8 ' 40 ' <br /> 10' 10 ' 40' <br /> Provide isolation joints between slabs on grade and sidewalks adjacent to <br /> fixed objects including curbs , inlets , etc . <br /> E . Finishing <br /> 1 . Strike off the concrete by means of a wood or metal screed used <br /> perpendicular to the forms in order to obtain the required grade , and <br /> remove surplus water and laitance . <br /> 2 . Broom-finish the concrete surface . The surface variations shall not be <br /> more than 1 /4 inch under a 10400t straight edge . Carefully finish the edge <br /> of the slabs on grade and sidewalk with an edging tool having a radius of <br /> 1 /2 inch . <br /> F . Curing : <br /> 1 . After the finishing operations have been completed and as soon as the <br /> concrete has hardened sufficiently that marring of the surface will not occur, <br /> the entire surface and the edges of the newly placed concrete shall be <br /> covered and cured with membrane curing compound . <br /> 2 . Curing compound shall be uniformly applied to the surfaces to be cured , in <br /> a single coat , continuous film , at the rate of one gallon to not more than 200 <br /> square feet , by a mechanical sprayer. <br /> 3 . Curing compound shall not be applied during periods of rainfall . Curing <br /> compound shall not be applied to the inside faces of joints to be sealed . <br /> Should the film become damaged from any cause within the required curing <br /> period , the damaged portions shall be repaired immediately with additional <br /> compound . Upon removal of side forms the sides of the slabs exposed <br /> shall immediately be coated to provide a curing treatment equal to that <br /> provided for the surface . <br /> G . Backfilling and Compacting : After the concrete has set sufficiently , refill the spaces <br /> adjacent to the concrete to the required elevation with suitable material . Place and <br /> thoroughly compact to 98 percent of the maximum density as determined by AASHTO T- <br /> 180 . <br /> 024404 02440 — Concrete Driveways , etc . . . <br />
The URL can be used to link to this page
Your browser does not support the video tag.