My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (5)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:43:21 AM
Creation date
10/1/2015 12:22:22 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7474
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 02510 <br /> STABILIZED SUBGRADE <br /> PART 1 - GENERAL <br /> 1 . 1 SCOPE <br /> A . The work specified in this Section consists of furnishing all material , transportation , <br /> tools , labor, and equipment to construct a firm and unyielding subgrade and all <br /> items called for or that can be reasonably inferred from the Drawings , including <br /> adding material , mixing , stabilizing , compacting , grading , testing , and other work as <br /> required for a complete job . This does not include subgrade for pump station <br /> driveway which is included in Section 02714 , <br /> PART 2 - PRODUCTS <br /> 2 . 1 PRODUCTS <br /> A . MATERIAL - Use local or hauled -in clean sand or sand and clay . <br /> Be STABILIZERS - Use high - bearing -value soil , sand -clay , ground limestone , crushed <br /> limerock , oyster shell , coquina shell , or rock screenings . Do not use muck , trash or <br /> hardpan . <br /> C . If soil cement paving is proposed do not use local yellow sand . <br /> D . In addition to these Specifications , the materials shall be in accordance with Section <br /> 914 , " Materials for Subgrade Stabilization , " of the DOT Standard Specifications for <br /> Road and Bridge Construction , latest edition . In the event of a conflict , the more <br /> stringent specification shall govern . <br /> PART 3 - EXECUTION <br /> 3 . 1 EXECUTION <br /> A . When completed , the stabilized subgrade shall conform to the sections shown on <br /> the Contract Drawings . <br /> Be If the natural soils are , <br /> acceptable for subgrade material but do not meet the <br /> p g <br /> required stability , approved stabilizing material may be brought in and uniformly <br /> mixed with the existing material to the depths shown on the Contract Drawings to <br /> produce the required bearing values , in accordance with Section 160-5 . 3 " Mixing " of <br /> the DOT Specifications for Road and Bridge Construction . x <br /> 02510- 1 02510 — Stabilized Subgrade <br />
The URL can be used to link to this page
Your browser does not support the video tag.