My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (5)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:43:21 AM
Creation date
10/1/2015 12:22:22 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7474
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 .06 FOUNDATION ROCK <br /> A sieve analysis of the limerock shall conform to the following limits : <br /> Passing 1 " - 100% <br /> Passing 3/4" - 90 - 100% <br /> Passing 3/8 " - 20 - 55% <br /> Passing #4 - 0 - 10% <br /> Passing #8 - 0 - 5% <br /> PART 3 - INSTALLATION <br /> 3 . 01 GENERAL REQUIREMENTS <br /> A. All work shall be proved to be in first class condition and constructed properly in <br /> accordance with the Drawings and Specifications. All defects and leaks disclosed by <br /> required testing shall be remedied. All tests shall be performed by the Contractor and <br /> observed by the Engineer. <br /> B . All pipe and structures shall be installed on dry, firm bedding. The free water surface <br /> shall be shall be lowered to at least 12 inches below the bedding surface prior to placing <br /> pipe or structures and shall be maintained at that depth throughout bedding, haunching, <br /> and initial backfilling of the work. During subsequent backfilling, the water level shall <br /> be kept sufficiently below the working surface to allow compaction of backfill to the <br /> required density, and until required density tests have been performed. <br /> C . Temporary supports shall be installed for adequate protection and maintenance of all <br /> underground and surface structures, water lines, drains, and other obstructions <br /> encountered in the progress of the work. Any structure which may have been disturbed <br /> shall be restored upon completion of the work. <br /> D. Blasting shall not be permitted except by written approval of the Engineer. <br /> E. Trenching and subsequent backfilling within the general construction site shall be <br /> accomplished as expeditiously as possible in order to prevent trench decay and <br /> maintain a clear operational area. <br /> F . Prior to any excavation or trenching outside the designated limits of the work site, the <br /> Contractor shall secure the necessary permits and/or authorization from the applicable <br /> Owner, or confirm that such has been previously obtained. The stipulations of said permit <br /> or authorization shall be completely followed and, prior to construction operations, <br /> notice shall be provided to the appropriate Owner and Engineer. <br /> 3 .02 HANDLING MATERIALS <br /> A. Pipe, fittings, and accessories shall be loaded and unloaded by hand or skidding so as to <br /> avoid shock or damage. Under no circumstances shall such materials be dropped. Pipe <br /> handled on skidways shall not be skidded or rolled against pipe already on the ground. <br /> B . In distributing the material at the site of the work, each piece shall be unloaded opposite or <br /> near the place where it is to be laid in the trench. <br /> 02530 — Gravity Sanitary Sewer Piping <br /> 02530- 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.