My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (5)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:43:21 AM
Creation date
10/1/2015 12:22:22 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7474
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART 3 - EXECUTION <br /> 3 .01 Foundations <br /> The standard foundation for pre-cast manholes shall be as follows : <br /> A. Undisturbed, existing in-place, natural granular soils consisting which have been finished <br /> graded by hand to final elevation. No over excavation shall be permitted. <br /> B . For manholes not placed on undisturbed, existing, in-place natural granular soils, a 12 <br /> inch layer of 3/8 " to 3/4" crushed rock shall be placed on the prepared trench bottom, and <br /> compacted. A two inch layer of high early strength cement grout may be placed on top of <br /> the rock base for leveling. The manhole base shall be set on the foundation, to the proper <br /> invert elevation, while the grout is still workable, so that the grout will fill all voids <br /> beneath the manhole base. <br /> 3 .02 Manholes <br /> All workmanship shall conform to best standard practice. Manholes shall be built accurately to the <br /> dimensions shown on the Plans . The top of the manholes shall be brought accurately to grade with <br /> masonry. <br /> Manholes shall be completed (with inverts, frames and covers) as the work progresses. <br /> Particular care shall be taken that no water rises on the masonry until the mortar is thoroughly set. <br /> Any masonry damaged in this manner shall be removed upon the order of the Engineer. H <br /> All pipes or castings to be embedded in masonry work shall be accurately set and if so required, <br /> headers shall be laid around the casting so embedded. Spurs and stubs for branch lines shall be built <br /> in the manholes where shown on the Plans or otherwise required by the Engineer. They shall be <br /> closed with vitrified plugs. <br /> 3 .03 Watertight Workmanship <br /> The entire work of constructing manholes must be carried on in a manner to insure watertight work. <br /> Any leaks in manholes shall be caulked, repaired or the entire work shall be removed and rebuilt. <br /> a <br /> 3 .04 Disposal of Water from Excavations rrf <br /> All water pumped or bailed from excavations shall be conveyed in a proper manner to a suitable <br /> point of discharge by the Contractor at his own expense . <br /> �r <br /> The Contractor shall provide for the disposal of water removed from excavations in a manner that <br /> will not cause injury to public health, private or public property, any portion of the work completed <br /> or in progress, the surface of the streets, or cause any impediments to the reasonable use of the site <br /> by other Contractors. The Contractor shall be responsible for complying with all the local <br /> regulations of the Department of Environmental Regulation regarding pollution of the canals. The <br /> Contractor shall take special precautions to eliminate any odor problems resulting from the <br /> discharge of sulfide water, such as submerged discharge outlets and overflow basins . <br /> 02531 — Gravity Sewer Manholes <br /> 02531 - 3 <br /> ■ <br />
The URL can be used to link to this page
Your browser does not support the video tag.