Laserfiche WebLink
PART 1- GENERAL <br />1.01 <br />1.02 <br />1.03 <br />SECTION 02539 <br />SUBMERSIBLE PUMPING STATION <br />RELATED WORK SPECIFIED ELSEWHERE <br />A. Site Work Division 02000 Sections <br />B. Concrete Work Division 03000 Sections <br />C. Coating Systems Division 09000 Sections <br />D. Electrical - General Division 16000 Sections <br />SCOPE OF SERVICES <br />A. The pumping station shall consist of a wet well structure, two (2) submersible sewage pumps, <br />an electrical control panel, liquid level controls, valve vault, valves, pump -out connection, <br />electric meter, electric and water service and all appurtenant piping and equipment as shown <br />on the Drawings and/or as specified. <br />B. The Contractor shall furnish all labor, materials, equipment and incidentals required and <br />install, place in operation, and field test a submersible wastewater pumping station. The <br />station shall be complete with pumps, motors, piping, valves, buried electric service, <br />electrical work (including motor controls and RTU), structures, connections and <br />appurtenances, tested and ready for service. <br />C. These specifications are intended to give a general description of what is required, but do not <br />cover all details which will vary in accordance with the requirements of the equipment as <br />offered. It is, however, intended to cover the furnishing, the shop testing, the delivery and <br />complete installation and field testing, of all materials, equipment and appurtenances for the <br />complete pumping units as herein specified and as shown on the Drawings, whether <br />specifically mentioned in these specifications or not. <br />D. For all units there shall be furnished and installed all necessary an desirable accessory <br />equipment and auxiliaries whether specifically mentioned in these specifications or not, and <br />as required for an installation incorporating the highest standard for the type of service <br />including field testing of the entire installation and instructing the regular operating personnel <br />in the care, operation and maintenance of all equipment. <br />PUMP SYSTEM REQUIREMENTS <br />A. Qualifications: <br />1. To assure unity of responsibility, the motors and control system shall be furnished <br />and coordinated by the pump manufacturer. The Contractor and manufacturer shall <br />assume responsibility for the satisfactory installation and operation of the entire <br />pumping system, including pumps, motors, and controls as specified. <br />2. The pumps covered by these specifications are intended to be standard pumping <br />equipment of proven ability as manufactured by a reputable manufacturer having <br />long experience in the production ofsuch pumps. The pumps furnished shall be <br />designed, constructed and installed in accordance with the best practice and methods, <br />02539 - Submersible Pump Station (Rev.) <br />02539-1 <br />