Laserfiche WebLink
maintenance personnel unfamiliar with such equipment. The number and special <br />requirements shall be as specified by the County, <br />2. A factory representative of all major component manufacturers, who has complete <br />knowledge of proper operation and maintenance, shall be provided for one (1) day to <br />instruct representatives of the Owner and the Engineer on proper operation and <br />maintenance. If there are difficulties in operation of the equipment due to the <br />manufacturer's design or Contractor's installation, additional service shall be <br />provided by the Contractor at no cost to the Owner. <br />1.05 TOOLS AND SPARE PARTS <br />A. One (1) set of all special tools required for normal operation and maintenance shall be <br />provided. All such tools shall be furnished in a suitable steel tool chest complete with lock <br />and duplicate keys. <br />The manufacturer shall furnish a complete set of recommended spare parts necessary for the <br />first five (5) years operation of the pumping system, which shall include at least the <br />following: <br />1. 1 - set of upper bearings for each pump supplied <br />2. 1 - set of lower bearings for each pump supplied <br />3, 1 - set of upper and lower shaft seals for each pump supplied <br />4. 2 — replacement fuses for each installed fuse <br />5. 1 — relay and phase monitor for each type supplied with the pump control panel <br />6. 1 — spare impeller <br />B. Spare parts shall be properly bound and labeled for easy identification without opening the <br />packaging and suitably protected for long term storage. <br />1.06 WARRANTY <br />A. All equipment supplied under this section shall be warranted for a period of one (1) year by <br />the Contractor and the equipment manufacturers. Warranty period shall commence on final <br />date when project is accepted by the. Owner. <br />B. The equipment shall be warranted to be free from defects in workmanship, design and <br />materials. If any part of the equipment should fail during the warranty period, it shall be <br />replaced and the machine(s) and/or the unit(s) restored to service at no expense to the Owner. <br />C. The manufacturer's warranty period shall run concurrently with the Contractor's warranty <br />period. No exception to this provision shall be allowed. <br />PART 2 - EQUIPMENT AND MATERIALS <br />2.01 PUMP FOUNDATION PLATES <br />A. Each pump shall be furnished with a foundation base plate which shall be rigidly and <br />accurately anchored into position. The pump manufacturer shall furnish all necessary <br />foundation bolts, plates, nuts, and washers for installation by the Contractor. Each foundation <br />plate shall be '/2" thick, Type 316 stainless steel. Foundation bolts, nuts, washers, and spare <br />parts shall be Type 316 stainless steel. <br />2.02 SEWAGE PUMPS <br />02539 — Submersible Pump Station (Rev.) <br />02539-3 <br />r� <br />