My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (5)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:43:21 AM
Creation date
10/1/2015 12:22:22 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7474
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
pump controls in such a way that if either device operates , the pump will shut down . The <br /> devices shall be self-resetting. The cable shall be fixed to the pump using a watertight <br /> trumpet assembly. The pump shall be capable of running continuously in a totally dry <br /> condition under full load, without damage, for extended periods . Before final acceptance, a <br /> field running test demonstrating this ability , with four (4) hours of continuous operation <br /> (water supplied by the contractor) under the above conditions , shall be performed for all <br /> pumps being supplied, if required by the IRCDUS . Pump motor cables shall be suitable for <br /> submersible pump applications and shall be properly sealed. <br /> B . Power cables shall be sized according to NEC standards and shall be of sufficient length to <br /> reach the control panel without splicing. The cable shall be oil resistant and capable of <br /> continuous submerged operation in raw sewage. The pump cable entry shall provide strain <br /> relief for the cable. The cable and entry into the pump shall be "Factory Mutual" approved <br /> for use in NEC Class 1 , Division 1 , Groups C and D hazardous locations . <br /> C . Lifting cables shall be provided for each pump . Each pump shall be fitted with a braided, 316 <br /> stainless steel lifting cable of adequate strength, and shall be five (5 ) feet longer than wet well <br /> depth to control panel to permit raising the pump for inspection and removal . <br /> 2 . 04 PUMP GUIDE RAILS & BRACKETS <br /> A. A guide rail base for sliding pump mount shall be an integral part of the pumping unit, and <br /> the pump casing shall have a machined connecting flange to connect with the cast iron guide <br /> rail base. The base shall be bolted to a stainless steel base plate affixed to the wet well bottom <br /> with stainless steel anchor bolts and so designed as to receive the pump connection without <br /> the need of any bolts or nuts . Sealing of the pumping units to the guide rail base shall be <br /> accomplished by a simple linear downward motion of the pump with the entire weight of the <br /> pumping unit guided by stainless steel guide tubes or T-bars which will press it tightly <br /> against the discharge connection or a single stainless steel guide with a locking guide rail <br /> base as approved by the Engineer. No portion of the pump shall bear directly on the floor of <br /> the sump and no rotary motion of the pump shall be required for sealing . The guide rail base <br /> shall have a 4-inch discharge elbow which shall be totally supported by the pump mount. <br /> 2 ,05 PUMP CONTROL SYSTEM <br /> n <br /> A. General <br /> 1 . A pump controller shall be provided for the wastewater pumping station . The <br /> controller shall respond to the liquid level switches to automatically start and stop <br /> pumps in response to liquid level in the wet well . <br /> I I j <br /> 2 . The pump controller shall be the standard system of the manufacturer as modified for <br /> this application . The wet well levels to be used in operation are as shown on the <br /> Drawings . <br /> 3 . All components within the pump control system shall be designed and sized to handle <br /> their maximum potential full load amperage and ground fault capacities . <br /> 4 . All electrical installations shall be conducted in accordance with the National Electric <br /> Code and all applicable local codes . <br /> 51 Prior to ordering electrical components the Contractor shall contact Florida, Power <br /> and Light to confirm the electric service and ground fault currents . This information <br /> 02539 - Submersible Pump Station (Rev.) <br /> 02539=5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.