My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (5)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:43:21 AM
Creation date
10/1/2015 12:22:22 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7474
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. Precast manhole sections used for the wet well shall conform to the wet well details shown on <br /> the Plans and shall - consist of a precast base cast poured monolithically with a minimum three <br /> foot length of barrel section. Additional barrel sections shall also be a minimum three feet <br /> in length. All concrete used in the construction of precast sections shall utilize Type II <br /> cement and have a 28 day compressive strength of 4,000 pounds per square inch . The precast <br /> sections shall conform with all applicable requirements of Division 03 of these specifications . <br /> 2 . 13 PRECAST CONCRETE VAULTS <br /> B . Precast concrete vaults shall conform to the vault details shown on the Drawings and <br /> shall consist of a precast monolithic base section and top slab . All concrete used in <br /> the construction of precast sections shall utilize Type II cement and have a 28 day <br /> compressive strength of 4, 000 pounds per square inch. The precast sections shall <br /> conform with all applicable requirements of Division 03 of these specifications . . <br /> 2 . 14 MISCELLANEOUS HARDWARE <br /> A. All hardware, bolts , anchors , accessories in the wet well and valve vault shall be stainless <br /> steel . <br /> B . Safety Netting — The wet well opening shall be provided with a rail mounted safety net <br /> system designed to be installed to the access hatch . The safety net shall easily slide on the <br /> guide rails to facilitate entry and then repositioned to prevent fall through . The net system <br /> shall be manufactured to fit the 300# access hatch specified in paragraph 2 . 10 above. The net <br /> system shall be manufactured of durable synthetic netting with all mounting and rail <br /> components constructed of stainless steel . The net system shall be as manufactured by "U. S . <br /> Netting" , Hatch net 121 System , or approved equal. <br /> 2. 15 PIPE AND FITTINGS <br /> A. Pipe : <br /> 1 . Ductile iron pipe shall conform to AWWA C151 (ANSI A21 .51 ) and shall be <br /> minimum pressure class 350 unless specified otherwise or shown otherwise on the <br /> Drawings . Pipe shall be furnished in standard 18 or 20 foot lengths unless shown <br /> otherwise on the Drawings . External surfaces of DI pipe shall be coated with a <br /> minimum 10 mil thickness of "Kop-Coat" Bitumastic 300M or Protech EP214 Epoxy <br /> Mastic or approved equivalent. Internal surfaces shall be coated to a minimum <br /> thickness of 40 mil with McWane's Protecto 401 ceramic lining or approved equal . <br /> I I J <br /> 2 . Polyethylene pipe shall be new , unused, sections of polyethylene pipe having a <br /> nominal density of 0 . 955 . The polyethylene resin used to manufacture the pipe shall . <br /> have a "Plastic Pipe Institute" material designation of PE 3408 , with an ASTM <br /> D3350 cell classification of 34544C . The pipe shall be black in color, containing <br /> approximately 2 percent U .V. stabilizer. Pipe shall be extruded to the wall thickness <br /> described in AWWA C906 for DRI 1 . Pipe outside dimensions shall meet that of <br /> ductile iron pipe size (D .I . P . S .) . Pipe shall be provided in nominal 40 foot long <br /> sections or pre-cut for the project . <br /> During the extrusion process, the HDPE pipe shall be continuously marked with <br /> durable printing including the following information : <br /> 02539 — Submersible Pump Station ( Rev. ) <br /> 02539-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.