My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (8)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:48:14 AM
Creation date
10/1/2015 12:22:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7475
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 .4 QUALITY ASSURANCE <br /> A. MPI Standards : <br /> 1 , Products : Complying with MPI standards indicated and listed in "MPI Approved Products List. " <br /> 2 . Preparation and Workmanship : Comply with requirements in "MPI Architectural Painting <br /> Specification Manual" for products and paint systems indicated. <br /> B . Mockups : Apply benchmark samples of each paint system indicated and each color and finish selected to <br /> verify preliminary selections made under sample submittals and to demonstrate aesthetic effects and set <br /> quality standards for materials and execution. <br /> 1 . Architect will select one surface to represent surfaces and conditions for application of each paint <br /> system specified in Part 3 . <br /> a. Vertical and Horizontal Surfaces : Provide samples of at least 100 sq. ft. (9 sq. m) . <br /> b . Other Items : Architect will designate items or areas required. <br /> 2 . Final approval of color selections will be based on benchmark samples. <br /> a. If preliminary color selections are not approved, apply additional benchmark samples of <br /> additional colors selected by Architect at no added cost to Owner. <br /> 1 . 5 DELIVERY, STORAGE, AND HANDLING <br /> A. Store materials not in use in tightly covered containers in well-ventilated areas with ambient temperatures <br /> continuously maintained at not less than 45 deg F (7 deg C) . <br /> 1 . Maintain containers in clean condition, free of foreign materials and residue . <br /> 2 . Remove rags and waste from storage areas daily. <br /> 1 .6 PROJECT CONDITIONS <br /> A. Apply paints only when temperature of surfaces to be painted and ambient air temperatures are between <br /> 50 and 95 deg F ( 10 and 35 deg C) . <br /> B . Do not apply paints in snow, rain, fog, or mist; when relative humidity exceeds 85 <br /> percent; at <br /> temperatures less than 5 deg F (3 deg C) above the dew point; or to damp or wet surfaces. <br /> 1 .7 EXTRA MATERIALS <br /> A. Furnish extra materials described below that are from same production run (batch mix) as materials <br /> applied and that are packaged for storage and identified with labels describing contents. I J <br /> 1 . Quantity: Furnish an additional 5 percent, but not less than 1 gal. (3 . 8 L) of each material and <br /> color applied. <br /> Wabasso Beach Park Revised 01/08/08 <br /> Indian River County 09911 - 2 <br /> DAA Project No . 6008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.