My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (8)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:48:14 AM
Creation date
10/1/2015 12:22:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7475
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G. Warranties : Sample of special warranties . <br /> 1 .4 QUALITY ASSURANCE <br /> A. Source Limitations : Obtain each type of detention toilet accessory from single source from single <br /> manufacturer. <br /> B . Welding Qualifications : Qualify procedures and personnel according to the following : <br /> 1 . AWS D1 , l /DI * IM, " Structural Welding Code - Steel. " <br /> 2 , AWS D1 .3 , " Structural Welding Code - Sheet Steel. " <br /> 3 , AWS D1 . 6, " Structural Welding Code - Stainless Steel. " <br /> C . Preinstallation Conference : Conduct conference at Project site . <br /> D . Coordination Meetings : Conduct coordination meetings at Project site to comply with requirements in <br /> Division 1 Section " Special Project Procedures for Detention Facilities. " <br /> 1 . 5 COORDINATION <br /> A. Coordinate installation of anchorages for detention toilet accessories. Furnish setting drawings, <br /> templates, and directions for installing anchorages, including sleeves, concrete inserts, anchor bolts, and <br /> items with integral anchors, that are to be embedded in adjoining construction. Deliver such items to <br /> Project site in time for installation. <br /> B . Coordinate wall construction to ensure that actual opening dimensions correspond to dimensions required <br /> for recessed detention toilet accessories . <br /> 1 . 6 WARRANTY <br /> A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace <br /> detention toilet accessories that fail in materials or workmanship within specified warranty period. <br /> 1 . Failures include, but are not limited to, the following: <br /> a. Structural failures including deflection exceeding 1 /4 inch (6 .3 mm) . <br /> b . Faulty operation of hardware . <br /> C . Deterioration of metals, metal finishes, and other materials . <br /> 2 . Warranty Period: Two years from date of Substantial Completion. <br /> 1 . 7 MAINTENANCE TOOLS <br /> A. Tool Kit: Provide six sets of tools for use with security fasteners, each packaged in a compartmented kit <br /> configured for easy handling and storage . <br /> Wabasso Beach Park 10812 - 2 <br /> Indian River County <br /> DAA Project No . 6008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.