My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (8)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:48:14 AM
Creation date
10/1/2015 12:22:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7475
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br /> 3 . 2 INSTALLATION <br /> A. Fastening to In-Place Construction: Provide anchorage devices and fasteners where necessary for <br /> securing detention toilet accessories to in-place construction. Include threaded fasteners for concrete and <br /> masonry inserts, security fasteners, and other connectors . <br /> B . Provide temporary bracing or anchors in formwork for items that are to be built into concrete or masonry <br /> or similar construction. <br /> C . Apply security sealant around perimeter in a continuous ribbon on back of detention toilet accessories <br /> before installation. <br /> D. Security Fasteners : Install detention toilet accessories using security fasteners with head style appropriate <br /> for installation requirements, strength, and finish of adjacent materials . Provide stainless- steel security <br /> fasteners in stainless-steel materials. <br /> 3 . 3 FIELD QUALITY CONTROL <br /> A. Inspect installed products to verify compliance with requirements. Prepare inspection reports and <br /> indicate compliance with and deviations from the Contract Documents. <br /> B . Remove and replace detention work where inspections indicate that work does not comply with specified <br /> requirements . <br /> C. Perform additional inspections to determine compliance of replaced or additional work. Prepare <br /> inspection reports . <br /> D . Prepare field quality-control certification that states installed products and their installation comply with <br /> requirements in the Contract Documents . <br /> 3A ADJUSTING AND CLEANING <br /> A. Remove temporary labels and protective coatings . <br /> B . Adjust safety hooks to release with application of 8-lbf (35 . 6-N) load. <br /> C . Painting: Immediately after erection, clean bolted connections and abraded areas of shop paint, and paint <br /> exposed areas with same material as used for shop painting to comply with SSPC-PA 1 for touching up <br /> shop-painted surfaces. <br /> D . Touchup Painting : Cleaning and touchup painting of bolted connections and abraded areas of shop paint <br /> are specified in Division 9 painting Sections. <br /> L <br /> END OF SECTION 10812 <br /> Wabasso Beach Park 10812 - 7 <br /> Indian River County <br /> DAA Project No. 6008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.