My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (8)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:48:14 AM
Creation date
10/1/2015 12:22:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7475
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D . Qualification Data: For qualified professional engineer. <br /> E . Welding certificates. <br /> F . Paint Compatibility Certificates : From manufacturers of topcoats applied over shop primers certifying <br /> that shop primers are compatible with topcoats . <br /> 1 . 5 QUALITY ASSURANCE <br /> A. Welding Qualifications : Qualify procedures and personnel according to AWS D1 . 1 /D1 . 1M, " Structural <br /> Welding Code - Steel. " <br /> B . Welding Qualifications : Qualify procedures and personnel according to the following: <br /> 1 . AWS D1 . 1 /D1 . 1M, " Structural Welding Code - Steel. " <br /> 2 . AWS D1 .2/D1 . 2M, " Structural Welding Code - Aluminum. " <br /> 3 , AWS D1 . 6, " Structural Welding Code - Stainless Steel. " <br /> 1 .6 PROJECT CONDITIONS <br /> A. Field Measurements : Verify actual locations of walls and other construction contiguous with metal <br /> fabrications by field measurements before fabrication. <br /> 1 .7 COORDINATION <br /> A. Coordinate selection of shop primers with topcoats to be applied over them. Comply with paint and <br /> coating manufacturers' written recommendations to ensure that shop primers and topcoats are compatible <br /> with one another. <br /> B . Coordinate installation of anchorages and steel weld plates and angles for casting into concrete . Furnish <br /> setting drawings, templates, and directions for installing anchorages, including sleeves, concrete inserts, <br /> anchor bolts, and items with integral anchors, that are to be embedded in concrete or masonry. Deliver <br /> such items to Project site in time for installation. <br /> PART2 - PRODUCTS <br /> 2 . 1 METALS, GENERAL <br /> A. Metal Surfaces, General: Provide materials with smooth, flat surfaces unless otherwise indicated. For <br /> metal fabrications exposed to view in the completed Work, provide materials without seam marks, roller <br /> marks, rolled trade names, or blemishes. <br /> 2 . 2 NONFERROUS METALS <br /> A. Aluminum Extrusions : ASTM B 221 (ASTM B 221M), Alloy 6063 -T6 . <br /> r <br /> B . Aluminum Castings : ASTM B 26B 26M, Alloy 443 .0-F , <br /> Wabasso Beach Park 05500 - 2 <br /> Indian River County <br /> DAA Project No . 6008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.