My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (8)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:48:14 AM
Creation date
10/1/2015 12:22:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7475
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 .7 COORDINATION AND SCHEDULING <br /> A. Coordinate selection of shop primers with topcoats to be applied over them. Comply with paint and <br /> coating manufacturers' written recommendations to ensure that shop primers and topcoats are compatible <br /> with one another. <br /> B . Coordinate installation of anchorages for railings . Furnish setting drawings, templates, and directions for <br /> installing anchorages, including sleeves, concrete inserts, anchor bolts, and items with integral anchors, <br /> that are to be embedded in concrete or masonry. Deliver such items to Project site in time for installation. <br /> C. Schedule installation so wall attachments are made only to completed walls . Do not support railings <br /> temporarily by any means that do not satisfy structural performance requirements. Jill' <br /> PART 2 - PRODUCTS <br /> 2 . 1 MANUFACTURERS <br /> A. Manufacturers : Subject to compliance with requirements, available manufacturers offering products that <br /> may be incorporated into the Work include, but are not limited to, the following : <br /> 1 . Stainless-Steel Pipe and Tube Railings : <br /> a. Blum, Julius & Co. , Inc . <br /> b. Stainless Fabricators, Inc . <br /> C . Tuttle Railing Systems ; Div. of Tuttle Aluminum & Bronze, Inc . <br /> 2 .2 METALS GENERAL <br /> A. Metal Surfaces, General: Provide materials with smooth surfaces, without seam marks, roller marks, <br /> rolled trade names, stains, discoloration, or blemishes . <br /> B . Brackets, Flanges, and Anchors : Cast or formed metal of same type of material and finish as supported <br /> rails unless otherwise indicated. <br /> 2 .3 STAINLESS STEEL <br /> A. Tubing: ASTM A 554, Grade MT 316L, <br /> B . Pipe : ASTM A 312/A 312M, Grade TP 316L , <br /> 2 .4 FASTENERS <br /> A. General: Provide the following : <br /> B . Fasteners for Anchoring Railings to Other Construction: Select fasteners of type, grade, and class <br /> required to produce connection suitable for anchoring railings to other types of construction <br /> indicated and capable of withstanding design loads . <br /> Wabasso Beach Park 05521 - 3 <br /> Indian River County <br /> DAA Project No. 6008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.