My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (8)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:48:14 AM
Creation date
10/1/2015 12:22:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7475
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART 3 - EXECUTION <br /> 3 . 1 EXAMINATION <br /> A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements for <br /> installation tolerances, substrate, and other conditions affecting performance of the Work. <br /> 1 . Examine solid roof sheathing to verify that sheathing joints are supported by framing or blocking, <br /> that tops of fasteners are flush with surface, and that installation is within flatness tolerances <br /> required for finished roofing installation. <br /> 2 . Verify that substrate is sound, dry, smooth, clean, sloped for drainage, and completely anchored, <br /> and that provision has been made for drainage, flashings, and penetrations through sheet metal <br /> roofing. <br /> B . For the record, prepare written report, endorsed by Installer, listing conditions detrimental to performance <br /> of the Work. <br /> C. Examine roughing-in for components and systems penetrating sheet metal roofing to verify actual <br /> locations of penetrations relative to seam locations of sheet metal roofing before installation. <br /> D . Proceed with installation only after unsatisfactory conditions have been corrected. <br /> 3 .2 UNDERLAYMENT INSTALLATION <br /> A. Self-Adhering Sheet Underlayment: Install self-adhering sheet underlayment, wrinkle free, on roof <br /> sheathing under sheet metal roofing. Apply primer if required by underlayment manufacturer. Comply <br /> with temperature restrictions of underlayment manufacturer for installation; use primer rather than nails <br /> for installing underlayment at low temperatures . Apply over entire roof, in shingle fashion to shed water, <br /> with end laps of not less than 6 inches ( 150 mm) staggered 24 inches (600 mm) between courses. <br /> Overlap side edges not less than 3 - 1 /2 inches (90 mm) . Roll laps with roller. Cover underlayment within <br /> 14 days. <br /> 1 . Roof perimeter for a distance up from eaves of 24 inches (600 mm) beyond interior wall line . <br /> 2 . Valleys, from lowest to highest point, for a distance on each side of 18 inches (460 mm) . Overlap <br /> ends of sheets not less than 6 inches ( 150 mm). <br /> 3 . Rake edges for a distance of 18 inches (460 mm) . <br /> 4 . Hips and ridges for a distance on each side of 12 inches (300 mm) . <br /> 5 . Roof to wall intersections for a distance from wall of 18 inches (460 mm) . <br /> 6 . Around dormers, chimneys, skylights, and other penetrating elements for a distance from element <br /> of 18 inches (460 mm) . <br /> B . Install flashings to cover underlayment to comply with requirements in Division 7 Section " Sheet Metal <br /> Flashing and Trim. <br /> C. Apply slip sheet before installing sheet metal roofing. <br /> Wabasso Beach Park 07610 - 7 <br /> Indian River County <br /> DAA Project No . 6008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.