My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (8)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:48:14 AM
Creation date
10/1/2015 12:22:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7475
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART 3 - EXECUTION <br /> 3 . 1 EXAMINATION <br /> A. Examine areas and substrates, with Installer present, and including welded hollow-metal frames, cast-in <br /> anchors, and structural framing, for compliance with requirements and other conditions affecting <br /> performance. <br /> 1 . Proceed with installation only after unsatisfactory conditions have been corrected. <br /> 3 .2 PREPARATION <br /> A. Protect adjacent work from soiling, spattering, moisture deterioration, and other harmful effects caused <br /> by plastering. <br /> B . Prepare solid-plaster bases that are smooth or that do not have the suction capability required to bond <br /> with plaster according to ASTM C 926 . <br /> 3 . 3 INSTALLING ACCESSORIES <br /> A. Install according to ASTM C 1063 and at locations indicated on Drawings. <br /> B . Control Joints : Install control joints at locations indicated on Drawings . <br /> 1 . As required to delineate plasterwork into areas (panels) of the following maximum sizes : <br /> a. Vertical Surfaces : 144 sq. ft. ( 13 .4 sq. m) . <br /> b . Horizontal and other Nonvertical Surfaces : 100 sq. ft. (9. 3 sq. m) . <br /> 2 . At distances between control joints of not greater than 18 feet (5 . 5 m) o . c . <br /> 3 . As required to delineate plasterwork into areas (panels) with length-to-width ratios of not greater <br /> than 2- 1 /2 : 1 . <br /> 4 . Where control joints occur in surface of construction directly behind plaster. <br /> 5 . Where plasterwork areas change dimensions, to delineate rectangular-shaped areas (panels) and to <br /> relieve the stress that occurs at the comer formed by the dimension change. <br /> 3 .4 PLASTER APPLICATION <br /> A. General: Comply with ASTM C 926 . <br /> 1 . Do not deviate more than plus or minus 1 /4 inch in 10 feet (6 .4 mm in 3 m) from a true plane in <br /> finished plaster surfaces, as measured by a 10-foot (3 -m) straightedge placed on surface . <br /> 2 . Grout hollow-metal frames, bases, and similar work occurring in plastered areas, with base-coat <br /> plaster material, before lathing where necessary. Except where full grouting is indicated or <br /> required for fire-resistance rating, grout at least 6 inches ( 152 mm) at each jamb anchor. <br /> 3 . Finish plaster flush with metal frames and other built-in metal items or accessories that act as a <br /> plaster ground, unless otherwise indicated. Where casing bead does not terminate plaster at metal <br /> frame, cut base coat free from metal frame before plaster sets and groove finish coat at junctures <br /> with metal. <br /> 4 . Provide plaster surfaces that are ready to receive field-applied finishes indicated. <br /> Wabasso Beach Park <br /> Indian River County <br /> DAA Project No. 6008 <br /> 09220 - 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.