My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (7)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:46:36 AM
Creation date
10/1/2015 12:23:39 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7476
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 02752 <br /> CONCRETE PAVING <br /> PART 1 - GENERAL <br /> 1 .01 SCOPE <br /> A . The work covered under this section shall include, but not necessarily be limited to the <br /> construction of a stabilized subgrade and concrete paving upon said subgrade. <br /> 1 .02 SUBMITTALS <br /> A. Shop Drawings - Prior to providing the materials, Contractor shall furnish to the Engineer, for <br /> review and approval, five (5) sets of shop drawings for: concrete mix; admixtures; steel <br /> reinforcing; and joint sealer. All drawings shall be reviewed, approved and stamped by the <br /> Contractor pursuant to the provisions of the General Conditions. <br /> 1 .03 TESTING AND INSPECTION <br /> A. Prior to the placement of any reinforcing steel or concrete, the Engineer and Contractor <br /> Representatives shall check the finished subgrade section for line and grade. <br /> B . The Contractor shall engage the services and pay for an independent testing laboratory to perform <br /> tests for bearing values and density, prior to the placement of any reinforcing steel or concrete. <br /> C . The Contractor shall engage the services and pay for an independent testing laboratory to perform <br /> concrete cylinder compressive strength tests. <br /> PART 2 - MATERIALS <br /> 2 . 01 EQUIPMENT <br /> All equipment, materials and personnel necessary for the proper placing, finishing, and curing of the <br /> concrete pavement shall be on theproject and in good working condition before the Contractor will <br /> be permitted to begin placing concrete. Throughout the construction of the project, the Contractor shall <br /> maintain the equipment in good working condition to assure the proper prosecution of the work. At a <br /> minimum the following equipment shall provided: <br /> A. Chutes, Wheelbarrows, Concrete Pumps — shall be provided where necessary to assure the <br /> concrete is properly placed and spread with no undo delays. <br /> B . Vibrators - Approved vibrators for consolidating concrete along the faces and corners of <br /> forms and adjacent to joints shall be provided. All necessary power sources shall be provided <br /> by the Contractor. <br /> C . Hand tools - The Contractor shall furnish all other equipment, hand tools (shovels, spades, hand <br /> trowels, float trowels, etc.) and supplies which are necessary for the proper prosecution of the <br /> work. <br /> D. Leveling Equipment - Unless otherwise approved by the Engineer in writing, the Contractor <br /> shall provide mechanical equipment of either the slip form or form paving type which will <br /> 02752 — Concrete Paving <br /> 02752- 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.