Laserfiche WebLink
SECTION 02752 <br /> CONCRETE PAVING <br /> PART 1 - GENERAL <br /> 1 .01 SCOPE <br /> A . The work covered under this section shall include, but not necessarily be limited to the <br /> construction of a stabilized subgrade and concrete paving upon said subgrade. <br /> 1 .02 SUBMITTALS <br /> A. Shop Drawings - Prior to providing the materials, Contractor shall furnish to the Engineer, for <br /> review and approval, five (5) sets of shop drawings for: concrete mix; admixtures; steel <br /> reinforcing; and joint sealer. All drawings shall be reviewed, approved and stamped by the <br /> Contractor pursuant to the provisions of the General Conditions. <br /> 1 .03 TESTING AND INSPECTION <br /> A. Prior to the placement of any reinforcing steel or concrete, the Engineer and Contractor <br /> Representatives shall check the finished subgrade section for line and grade. <br /> B . The Contractor shall engage the services and pay for an independent testing laboratory to perform <br /> tests for bearing values and density, prior to the placement of any reinforcing steel or concrete. <br /> C . The Contractor shall engage the services and pay for an independent testing laboratory to perform <br /> concrete cylinder compressive strength tests. <br /> PART 2 - MATERIALS <br /> 2 . 01 EQUIPMENT <br /> All equipment, materials and personnel necessary for the proper placing, finishing, and curing of the <br /> concrete pavement shall be on theproject and in good working condition before the Contractor will <br /> be permitted to begin placing concrete. Throughout the construction of the project, the Contractor shall <br /> maintain the equipment in good working condition to assure the proper prosecution of the work. At a <br /> minimum the following equipment shall provided: <br /> A. Chutes, Wheelbarrows, Concrete Pumps — shall be provided where necessary to assure the <br /> concrete is properly placed and spread with no undo delays. <br /> B . Vibrators - Approved vibrators for consolidating concrete along the faces and corners of <br /> forms and adjacent to joints shall be provided. All necessary power sources shall be provided <br /> by the Contractor. <br /> C . Hand tools - The Contractor shall furnish all other equipment, hand tools (shovels, spades, hand <br /> trowels, float trowels, etc.) and supplies which are necessary for the proper prosecution of the <br /> work. <br /> D. Leveling Equipment - Unless otherwise approved by the Engineer in writing, the Contractor <br /> shall provide mechanical equipment of either the slip form or form paving type which will <br /> 02752 — Concrete Paving <br /> 02752- 1 <br />