• Gas sumps (4) , condensate force main and airline <br /> • Isolation valves <br /> • Air compressor <br /> 6 Acre Vertical Expansion (Segment 1) • <br /> • Perimeter berm <br /> • 12 inch general fill <br /> • 6 inch subbase <br /> • Geosynthetic Clay Liner <br /> • 60 mil HDPE geomembrane liner <br /> • 24 inch liner protective layer <br /> • Liner system tie- in and anchor trench <br /> 11 . 5 Acre Partial Closure ( Segment 11) : <br /> • 12 inch general fill <br /> • 40 mil linear low- density polyethylene geomembrane liner <br /> • Geocomposite drainage layer <br /> • 18 general fill liner protective cover <br /> • Liner system tie - in and anchor trench <br /> • Drainage layer outlet features <br /> 1 . 6 . Borrow Pond Construction . The Contractor shall construct the Borrow Pond <br /> as depicted on Geosyntec project #FL1537 - 06 dated February 2009 . <br /> • Mobilization/Demobilization <br /> • Surveying — Initial , interim and final as-Built <br /> • Clearing, Grubbing , and/or Stripping — 10 . 5 acres <br /> • Removal , relocation and replanting of trees — 58 trees <br /> • Dewatering system — During four month period monitor dewatering system <br /> • Silt Fence — Furnish 2 , 988 If of silt fence for owner use <br /> • Stockpile Area Management and Erosion Control — During four month period <br /> • Temporary Recharge Ditch — Construct as designed <br /> • Check dam — Construct as designed <br /> • Revegetation and stabilization of stockpile area — Construct as designed <br /> • Dust Control — During four month period <br /> 2 . The existing Article 11 — COMPENSATION of the Contract is modified to include <br /> the following : <br /> 2 . 5 Payment for Vertical Expansion and Partial Closure of Class I Landfill <br /> Project. Payment of the Vertical Expansion and Partial Closure of Class I Project as <br /> set forth in Geosyntec project #FL1537 - 03 dated December 2008 will be <br />