My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-109
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-109
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2016 10:33:55 AM
Creation date
10/1/2015 3:29:19 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Second Amendment
Approved Date
04/14/2009
Control Number
2009-109
Agenda Item Number
15.B.2
Entity Name
Waste Management Inc. of Florida
Subject
Class 1 Landfill Operations expansion and partial closure
Second Amendment
Area
1325 74th Ave. SW
Supplemental fields
SmeadsoftID
10582
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE # 1 ( REVISED 4 MARCH 2009 ) <br /> SOLID WASTE DISPOSAL DISTRICT <br /> INDIAN RIVER COUNTY LANDFILL <br /> VERTICAL EXPANSION AND PARTIAL CLOSURE <br /> SCHEDULE # 1 TO SECOND AMENDMENT <br /> Item Work Description/Item <br /> No. Environmental Specialties Inc. <br /> General Site Preparation <br /> Material Material + <br /> Units Quantity Unit Cost Labot Unit Cost Labor Unit TOTAL <br /> Cost <br /> Mobilization and Demobilization ( See Note 1 ) Lump Sum 1 $0. 00 $0. 00 $360, <br /> 174 . 00 $360, 174 . 00 <br /> 2 Surveying ( See Note II ) Lump Sum I 50 . 00 $0. 00 $ <br />169, 044 . 00 $ 169,044 . 00 <br /> 3 <br /> Site Preparation ( See Note 111 ) ( Includes 17 , 776 CY of General Fill for Closure Area ) Lump <br /> Sum I $0. 00 $0 . 00 $3021959 . 00 $302 ,959 . 00 <br /> $832, 177.00 <br /> L91 <br /> 4 HDPE Piping ( w% excavation and backfill ) <br /> A . I8- in . HDPE SDR 17 header (0'-4') feet 31100 $31 . 00 $23 . <br />00 $54 . 00 $ 167400 . 00 <br /> C . 12-in . HDPE SDR 17 header ( 0'-4' ) feet 450 $ 15 . 00 $ 17 . <br />00 $32 . 00 $ 14,400. 00 <br /> D. 10-in . HDPE SDR 17 header ( 0'-4' ) feet 2 ,600 $ 12 . 00 $ 16 <br />. 00 528 . 00 $ 7200. 00 <br /> 8h '012 <br /> X, _ �. fir. Vis.. . . . r-, _ <br /> r <br /> G . Connection to existing 14 " header each 1 $ 1 ,850. 00 $3 , 750. <br />00 551600.00 $5 ,600 . 00 <br /> H . Ihorizontal collector gas extraction trench W . 81 )-m . HDPE SDR I1 feet <br /> 41000 $ 13 . 00 $23 . 00 <br /> $36 . 00 $ 1441000. 00 <br /> $4881200.00 <br /> 5 Isolation Valves <br /> A . 10" valve each 1 $21420. 00 $980. 00 $3 ,400. 00 $ <br />3 ,400. 00 <br /> B . 12 " valve each 1 $35000. 00 $ 11200. 00 $45200 . 00 <br /> $4,200. 00 <br /> C . 18 " valve each 4 $ 10,550. 00 $2 ,950. 00 $ 13 ,500 . <br />00 $54,000. 00 <br /> 6 119 $61 ,600.00 <br /> A . Drilling 36 " Dia. Bore with well completion (8 " SCH 80 PVC ) feet 1 ,400 $24. <br />00 $51 . 00 $ 75 . 00 S105 ,000. 00 <br /> B. 2 " Wellheads ( WM standard ) each 46 $500 . 00 $ 170 . 00 $670. <br />00 $30,820. 00 <br /> C . Wellheads for Horizontal Collectors each 12 $280 . 00 $ 120 . 00 <br /> $400 . 00 $4 ,800. 00 <br /> FL1537\JL80339 . xls <br /> Page 1 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.