My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/22/1967
CBCC
>
Meetings
>
1960's
>
1967
>
02/22/1967
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2018 9:37:51 AM
Creation date
6/10/2015 1:01:41 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
02/22/1967
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The County Attorney advised the Board that motions have been <br />filed on behalf of the County in the_suit against the County on the <br />recent change in zoning affecting lands of Mr. Russell Burks. (No.939, <br />Wynn, et al vs. Graves, as Chairman et al) The Board then discussed <br />how much time and money should the County spend in defending suits <br />of this nature. After considerable discussion, Commissioner Mac- <br />donald moved, seconded by Commissioner Bogosian and unanimously <br />carried, that the County Attorney be requested to advise Mr. Burks <br />that this Board does not contemplate taking any further action in <br />this suit. <br />The Board then recessed at 11:50 A. M. and reconvened at 1:00 P.M. <br />A letter from Dr. Hugh Pugliese,requesting the County to look into <br />the possibility of having certain buildings razed which are adjacent to <br />his property in W. E. Geoffrey's Subdivisi®n, was received and considered <br />by the Board. No action was taken, pending further study and investi- <br />gation. <br />The County Administrator was directed to reject the offer received <br />by letter from Mr. Paul Engler to purchase the Wabasso Beach Park buildings <br />and land for $12,000.00. <br />The Administrator reported that he has received from the State <br />r <br />Road Department, cost estimates for the sidewalks, bicycle paths,.and <br />traffic signals on Emerson Avenue between Glendale Road and the South <br />Relief Canal; the estimates being $36,000, if sidewalks and bicycle <br />paths are constructed on both sides; $20,000, if only on one side. <br />Upon Motion by Commissioner Macdonald, seconded by Commissioner Mc - <br />Cullers and unanimously carried, the Administrator was requested to <br />discuss with Superintendent Thompson and the School Board.to see if <br />they would be willing to participate in the cost of this additional• <br />construction. <br />FEB 221967 <br />
The URL can be used to link to this page
Your browser does not support the video tag.